Filling The Heating System; Switching The Power On; Matching The Control Unit To The Heating System - Viessmann KOB Pyromat ECO Service Instructions For Contractors

Wood gasification boiler for 50 cm or 100 cm logs
Table of Contents

Advertisement

Further details regarding the individual steps

Filling the heating system

1. Check the pre-charge pressure of the
diaphragm expansion vessel.
If the pre-charge pressure of the dia-
phragm expansion vessel is lower
than the static system pressure, top
up with nitrogen until the pre-charge
pressure is 0.1 to 0.2 bar higher.
Adjust the pre-charge pressure
accordingly if it is too high.

Switching the power ON

Matching the control unit to the heating system

Subject to the equipment level, the control unit must be matched to the system.
Boiler temperature
Heating
DHW
Solar energy
START
Information
STOP
Check and possibly adjust all addresses
in Code 1 (see chapter "Code 1").
48 °C
Select with
(
Commissioning, inspection, maintenance
2. Top up your heating system with
water and vent until the fill pressure
is 0.1 to 0.2 bar higher than the pre-
charge pressure of the diaphragm
expansion vessel.
Permiss. operating pressure: 3 bar
Test pressure: 4 bar
3. Mark the fill pressure at the pressure
gauge.
Note
The chapters "Coding 1" (from page
14) and "Coding 2" (from page 18)
contain additional setting options.
7