Shutting Down The System; Cleaning The Combustion Chamber - Viessmann KOB Pyromat ECO Service Instructions For Contractors

Wood gasification boiler for 50 cm or 100 cm logs
Table of Contents

Advertisement

Commissioning, inspection, maintenance
Further details regarding the individual steps
6. d
to confirm.
7. |/~ for the required temperature.
Changing slope and level
Individually adjustable for each heating
circuit.
110
+20
Outside temperature in °C
A Changing the slope
B Changing the level (vertical parallel
offset of the heating curve)

Shutting down the system

Operating instructions - Pyromat
ECO

Cleaning the combustion chamber

Cleaning work to be carried out:
■ Clean the top combustion chamber
■ Clean the tubular heat exchanger
■ Clean the bottom combustion cham-
ber
■ Clean the hopper
12
3.5
1.4
A
B
0.2
-20
8. d
to confirm.
Press the following keys in the standard
menu:
1. å
for Advanced menu.
2. Ù / Ú
for selecting the heating cir-
cuit.
3. |/~ for "Heating curve".
4. d
to confirm.
5. |/~ for "Slope" or "Level".
6. d
to confirm.
7. |/~ for the required value.
8. d
to confirm.
9. With g back to the default display.
Operating instructions - Pyromat
ECO
(cont.)

Advertisement

Table of Contents
loading

Table of Contents