Start Up Sheet - Johnson Controls York International TM9X Series Installation Manual

Single stage ecm residential gas furnaces
Hide thumbs Also See for York International TM9X Series:
Table of Contents

Advertisement

SECTION XIII: START UP SHEET
Start-Up Date
Technician Performing Start-Up
Owner Information
Name
City
Equipment Data
Furnace Model
Evaporator Coil Model
Outdoor Unit Model
Furnace Configuration
Upflow
Downflow
Filter, Thermostat, Accessories
Filter Type
Thermostat Type
Connections -- All Per Installation Instructions and Local Code
Unit is level
Gas piping is connected (including drip leg)
Vent system is connected
Condensate Management
Condensate tubing is correctly installed for the furnace position
Venting
Intake Size
# of 90 Degree Ells
Exhaust Size
# of 90 Degree Ells
Venting system is the proper size, within the limitations of the chart in the installation instructions,
properly connected to the furnace, and properly pitched
Electrical: Line Voltage
Polarity is correct (black is L1 (hot), white is N (neutral)
Line voltage value to furnace (volts AC)
Electrical: Low Voltage
Thermostat wiring is complete
Low voltage value between "R" and "C" on furnace control board (volts AC)
Johnson Controls Unitary Products
33" 95% AFUE Single Stage Gas Furnace Start Up Sheet
Proper furnace start up is critical to customer comfort and equipment longevity
State or Province
Furnace Serial
Evaporator Coil Serial
Outdoor Unit Serial
Horizontal Left
Filter Size
Other System Equipment and Accessories
# 0f 45 Degree Ells
# 0f 45 Degree Ells
Thermostat heat anticipator set to .40 (if present)
Installing Contractor Name
Address
Zip or Postal Code
Horizontal Right
Filter Location(s)
Supply plenum and return air are connected
Condensate drain is connected
Length
Length
Ground wire is connected
1083288-UIM-A-0114
Continued on next Page
39

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents