Condensate Piping And Furnace; Venting Configuration; Typical. Condensate Drain, Vertical Installation - Johnson Controls York International TM9X Series Installation Manual

Single stage ecm residential gas furnaces
Hide thumbs Also See for York International TM9X Series:
Table of Contents

Advertisement

ACCESSORY CONNECTIONS
The furnace control will allow power-switching control of various acces-
sories.
ELECTRONIC AIR CLEANER CONNECTION
Two 1/4" (6.4 mm) spade terminals (EAC and NEUTRAL) for electronic
air cleaner connections are located on the control board. The terminals
provide 115 VAC (1.0 amp maximum) during circulating blower opera-
tion.
HUMIDIFIER CONNECTION
Two 1/4" (6.4 mm) spade terminals (HUM and NEUTRAL) for humidifier
connections are located on the control board. The terminals provide 115
VAC (1.0 amp maximum) during heating system operation.
A mounting hole is provided on the control panel next to the furnace
control board for mounting a humidifier transformer if required.
TWINNING
These furnaces are not to be twinned. If more than one furnace is
needed in an application, each furnace must have its own complete
duct system and its own wall thermostat.
SECTION VI: CONDENSATE PIPING AND
FURNACE VENTING CONFIGURATION
CONDENSATE DRAIN LOCATION
As shipped from the factory:
• For all 040, 060 & 080K input fur n aces the main drain is plumbed
through the casing right-side opening when viewed from the front
of the furnace.
• For all 100 & 120 input furnaces the main drain is plumbed through
the casing left-side opening when viewed from the front of the fur-
nace.
NOTICE
The Figures 21 - 24 show the condensate drain arrangement for the
various possible furnace and vent blower positions.
The condensate hoses must slope downwards at all points.
The furnace condensate pan is self priming and contains an internal
trap to prevent flue gas leaking. Do not install an external condensate
trap.
When drain hose routing changes are required (shown in Figures 21-
24), be sure to cap all un-used openings.
If rerouting hoses - excess length should be cut off so that no sagging
loops will collect and hold condensate - which will cause the furnace to
not operate.
No hose clamps are needed for connecting to the condensate pan.
The furnace, evaporator coil, and humidifier drains may be combined
and drained together. The evaporator coil drain may have an exter-
nal, field-supplied trap prior to the furnace drain connection to prevent
conditioned air leakage. All drain connections (furnace, evaporator
coil, or humidifier) must be terminated into an open or vented drain as
close to the respective equipment as possible. Regular maintenance
is required on condensate drainage system.
Johnson Controls Unitary Products
Condensate must be disposed of properly. Follow local plumbing
or wastewater codes. The drain line must maintain a 1/4" per foot (20
mm/m) downward slope to the drain.
If an external vent tee is being installed, then it must have its own
condensate trap before it is disposed into an open or vented drain.
This is not to be considered as a second trap as referenced else-
where in this document.
FIGURE 20: Typical. Condensate Drain, Vertical Installation
The condensate will flow to the drain better if an open stand pipe is
installed in the drain line. See Figure 20.
If evaporator coil or humidifier drains are combined with the furnace
drain, then the open stand pipe could be raised higher, above the 5"
minimum.
Do not drain other devices (humidifier, evaporator coil, etc.) into the top
opening of the vent stand pipe. Instead, install a second tee in the
vented drain tube below the furnace drain tee and route additional
drainage through the new tee.
1083288-UIM-A-0114
Open Stand Pipe
(Anti-s iphon air vent)
5" Min.
Tee
To Open Or
Vented Drain
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents