SERVICE MAINTENANCE SCHEDULE - NON DUCTED AIR CONDITIONING SYSTEMS

Your Rinnai Air Conditioning System should be maintained annually after the date of installation by a qualified
licensed technician in accordance with the Schedule below. Failure to do so during the product warranty period
may void your warranty. This periodic service and maintenance will prolong the useful life of the unit, and help
keep it running safely and at optimum efficiency.
Date of Installation 
Service Year 
Service Date
Service Company / Technician
Ambient Temperature at CDU (°C)
ELECTRICAL
Wiring, Electrical connections
Fan Motors 
Capacitors (if applic)
Printed circuit boards
MAJOR COMPONENTS
Outdoor unit clearances
Outdoor unit condensate tray
Outdoor unit condensate drain
Outdoor unit fixing
Indoor unit condensate tray
Indoor unit condensate drain / pump
Refrigerant charge
Refrigeration connections
Fan assemblies
Return Air grille & filters
CONTROLS
Louver operation
Remote operation
System Operation
Sequence of operation
Return Air Temp ‐ Cooling/ Heating
Outlet Air Temp ‐ Cooling / Heating
Outdoor unit ‐ Liquid line pressure
Outdoor unit ‐ Suction line pressure
 GENERAL INSTALLATION‐RELATED AND 3rd PARTY COMPONENTS (NOT RINNAI PRODUCTS) *
Airflow through system
Refrigerant pipework
Safety tray
Wall mounting
CONSUMABLES **
Capacitors
Filters
Batteries (If applic)
* Installation and other field‐supplied components are not covered by Rinnai Product Warranty. These include, but are not limited to, control wiring, refrigerant gas and electrical 
connections to the appliance. These should be inspected as they can affect the performance, reliability and safety of the system.
** Units contain consumable items that may require periodic replacement and are not covered by Rinnai product warranty (e.g. filters, capacitors and batteries)
Inspected ‐ Working Correctly ‐ No Action Required
 
Rinnai
  /           /
Installed By:
1
2
  /           /
  /           /
o
o
C
C
o
o
C
C
kPa
kPa
kPa
kPa
ACTION CODES
Adjusted Part
3
4
  /           /
  /           /
o
C
o
C
kPa
kPa
Cleaned Part 
Replaced Part 
R
16
5
6
  /           /
  /           /
o
o
C
C
o
o
C
C
kPa
kPa
kPa
kPa
Repaired Part 
Referred to Installer
RP
RI
Split AC OM
o
C
o
C
kPa
kPa