ID61/62 Series Panel - Installation, Commissioning & Configuration Manual
2

Installation Guide

2.1 How to Use this Section

This Installation Guide provides guidelines on how to
install an ID61/62 Series Panel quickly and safely.
For each stage in the panel installation and
commissioning procedures a brief description is given of
its purpose, complete with detail drawings, flow diagrams
and/or other graphics to make the instructions easy to
follow. Where required, procedures may be broken down
into one or more related diagrams, the number being
dependent upon the complexity of the defined task.

2.2 Pre-installation Check List

Before installing the ID61/62 Series Panel or fitting
sensors, you must first ensure that the following criteria
have been met. Failure to do this may not only result in
damage to the equipment, but may also cause problems
when commissioning the equipment or adversely affect
its performance.
2.2.1 Some Panel DO's and DON'T's
Before selecting a location for the ID51/52 Series Panel,
DO make sure that:
a. The operating ambient temperature is in the
recommended range:
+5
o
C to +35
o
b. The relative humidity is between:
5% and 95%
c. The panel is wall mounted in a position which allows
clear visibility of displays and easy access to operating
controls. The height above floor level should be
chosen such that the LCD is just above normal eye
level (approximately 1.5 metres).
7
C and
997-457-000-8, Issue 8
January 2010