Notes For Venting Options; Vent Coupling And Adapter With Gaskets; Vent Coupling And Adapter; Inducer Vent Elbow - Carrier 59TP6B Installation, Start-Up, Operating And Service And Maintenance Instructions

Two-stage variable speed ecm multipoise condensing gas furnace
Table of Contents

Advertisement

1. Attach vent pipe adapter with gasket to furnace casing.
2. Align notches in rubber coupling over standoffs on adapter. Slide clamps over the coupling.
3. Slide vent pipe through adapter and coupling into vent elbow.
4. Insert vent pipe into vent elbow.
5. Torque all clamps 15 lb.- -in.
6. Attach combustion air pipe adapter with gasket to furnace.
7. Attach combustion air pipe to adapter with silicone. Pilot drill a1/8- -in. hole in adapter and secure with a #7 x 1/2- -in. sheet metal
screw.
Attach gaskets to vent pipe and
combustion air adapters.

NOTES FOR VENTING OPTIONS

Fig. 47 - - Vent Coupling and Adapter with Gaskets
TABS ON THE INDUCER OUTLET RESTRICTOR SNAP
INTO THE SLOTS AT THE OUTLET OF THE INDUCER
SEE MAXIMUM EQUIVALENT VENT LENGTH TABLE
(10FT. (3.1 M) OF VENT OR LESS ONLY)
Fig. 48 - - Inducer Vent Elbow

Vent Coupling and Adapter

FOR USAGE:
52
A13074
A170006

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents