Fujitsu PRIMERGY PG-R1CK6 User Manual page 75

F200 rack conversion kit
Table of Contents

Advertisement

2
Attach the rail assemblies (from step 1) and insert the rack nuts into the
rack holes.
This server requires 4U of rack cabinet space.
24
Conversion procedure
1
Attach the rails.
Hang the metal hooks located at the rail ends into the frame holes (see dia-
gram) and fasten with the 8 screws (M5) provided by aligning the brackets
with the spring-nuts in the rack.
2
Attach the rack nuts.
Insert the rack nuts in the rack's 2nd and 11th hole positions (counting up from
the bracket base). When inserting the nuts, make sure to use the ones provided
with the kit (M5) as they have special catches to secure their hole positions.
[Front]
To 11th slot hole
To 2nd slot hole
Server bottom
as reference point
Use the rack nuts (M5) provided with the rack conversion kit and
not the ones provided with the rack.
[Rear]
M5 rack nuts
M5 screws
M5 screws

Advertisement

Chapters

Table of Contents
loading

Table of Contents