Commissioning
Bosch Rexroth AG, DBA...1X/...E, RE 25880-B/10.18
▶
The lines used have to be suitable for operating temperatures of –20 °C...+100 °C.
▶
Make sure that the voltage supply is switched off.
▶
Connect the protective earthing conductor and the earthing correctly.
▶
Ensure that there are no bends in the connection line and litz wires to avoid
short-circuits and interruptions.
▶
Only assemble the cable and line entry according to the assembly instructions.
▶
During the assembly, ensure leak-tightness between cable and cable and line
entry.
▶
Route the connection line(s) in a pull-relieved form. The first mounting point must
be within 15 cm of the cable entry.
▶
Use only lines satisfying the requirements on the terminal areas of the connection
terminals according to the data sheet.
8 Commissioning
Faulty assembly, leaking hydraulic fluid!
Carelessly or incorrectly fastened safety valves may become loose during operation,
fall down and cause serious injuries. A hydraulic fluid jet may leak at incompletely
mounted hydraulic connections and connection lines and cause serious injuries.
▶
Only commission the system after all hydraulic connections and the safety valve
have been completely and properly mounted according to the specifications.
▶
Look out for defective sealing points and exchange defective seals immediately.
▶
Wear personal protective equipment during the initial commissioning.
Personal injury and damage to property!
Commissioning of the safety valve requires basic hydraulic knowledge.
▶
Only qualified personnel (see chap. 2.4 "Qualification of personnel") is
authorized to commission the safety valve.
▶
Make sure that all hydraulic ports are closed.
▶
Commission the safety valve only if it is completely installed.
▶
Immediately depressurize the system if hydraulic fluid still leaks despite proper
assembly and continue with chapter 14 "Troubleshooting".
WARNING