National Instruments SCXI-1325 Installation Manual page 5

High-voltage terminal block
Table of Contents

Advertisement

2
1
Back View
1 Strain-Relief Bar
2 Strain-Relief Screws
SCXI-1325 Installation Guide
5.
Connect the wires to the screw terminals by inserting the stripped end
of the wire fully into the terminal. No bare wire should extend past the
screw terminal. Exposed wire increases the risk of shorting and
causing a failure.
6.
Tighten the screws to a torque of 5–7 in.-lb.
7.
Connect safety earth ground to the safety-ground solder lug. Refer to
the
Safety Information
8.
Reinstall the strain-relief bar and tighten the strain-relief screws.
9.
Reinstall the top cover and tighten the top cover screws.
10. Connect the terminal block to the module front connector as explained
in the
Installation
Figure 1 shows the SCXI-1325 terminal block parts locator diagram.
3
4
3 Safety-Ground
Solder Lug
Figure 1. SCXI-1325 Parts Locator Diagram
section for connection information.
section.
6
5
Front View
4 Mating Connector
5 Thumbscrew
4
7
6 Top Cover Screws
7 Top Cover
www.ni.com

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents