4 - LOCATION OF COMPONENTS

4.3 - Assembly/air flow direction

UNDER 1

5 - INSTALLATION: UNIT/FRAME/PLENUM

5.1 - Setting the unit in place

- The unit must be placed on a flat, smooth surface which is as level as possible (ratio of approx. one to one thousand). 
- If the supply air is conveyed through a raised floor, the seal between the unit and the floor must be tight.
- The unit need not be anchored to the floor if it is operated under normal conditions.
- Provide sufficient space for maintenance around the unit.
- The cabinet frame must rest fully on its contact surface.
■ Units fitted with a support base
- The floor must be as flat as possible,
- A seal must be placed between the unit and bed of the frame.
- Level the unit by adjusting the legs on the support base, (see the drawing of the base 
supplied with the unit)

5.2 - Units equipped with a plenum:

■ Supply/extraction plenum
Proposed  when  air  is  to  be  distributed  directly  into  a  space.  It  is  mounted  on  top  of  the  cabinet  and 
features double-deflection grilles to allow the direction of the air stream to be adjusted. 
The plenum may also be used mounted at the bottom to carry air directly from a space back to the air
handling system.
The plenum is secured from the inside at the 4 corners. To secure it, the diffusion grille on the front panel
must therefore be removed.