Installation In New Construction; Wall Inlet Rough-In - NuTone VX1000C Installation Instructions Manual

Built-in central cleaning system
Hide thumbs Also See for VX1000C:
Table of Contents

Advertisement

NEW CONSTRUCTION

WALL INLET ROUGH-IN

Once the locations for the wall inlets have been determined, mount all inlet brackets.
1. Choose the appropriate mounting bracket for the inlet being installed. (See chart)
395
330
360
X
CI335
CI358
CI370
X
CI390
CI395
CI398
2. To locate a bracket on a wall stud, measure approximately 18" up from finished floor level. (Height may vary according to
individual preference.)
MODEL CF361 & CF361F (For Use with
CI370 and 360 Inlets)
3. Refer to Figure 10. Nail bracket to the side of the stud so
that the front edge of the bracket is flush to the front of
the stud. (The bracket may also be nailed to the front
edge of the stud. See face mounting illustrated. For face
mounting, use locating tabs on bracket for proper alignment.)
MODEL CF361 & CF361F
SIDE
MOUNTING
3
2
/
"
8
FIGURE 10
INSTALLATION IN
396-1
396-3
CI3301RK
X
X
Rough-in and wall valve sold together
X
X
FACE
MOUNTING
13
1
/
"
16
Rough-In Series
CI3303RK
CF329
X
X
X
X
X
X
X
FIGURE 11
4. Refer to Figure 11. Remove cardboard from plaster
guard frame. Using four (4) provided screws, attach the
appropriate flanged fitting and inlet seal to back
of inlet.
5. Replace cardboard in plaster guard frame.
MODEL CF329 (For Use
with 330 Inlets)
6. When using Model CF329, glue
elbow to mounting plate. Attach
to stud as shown in Figure 12.
7
CF361
CF361F
CI395RK
X
X
X
X
MODEL V144
FIGURE 12
X
X

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vx475Vx550cVx475cVx550Vx1000

Table of Contents