Installation In New Construction; Wall Inlet Rough-In - NuTone VX1000C Installation Instructions Manual

Built-in central cleaning system
Hide thumbs Also See for VX1000C:
Table of Contents

Advertisement

NEW CONSTRUCTION

WALL INLET ROUGH-IN

Once the locations for wall inlets have been determined, mount all inlet brackets.
1. Choose the appropriate mounting bracket for the inlet being installed. (See chart.)
395
330
360
X
CI335
CI358
CI370
X
CI390
CI395
CI398
2. To locate bracket on wall stud, measure approximately 18" up from finished floor level. (Height may vary according
to individual preference.)
MODEL CF361 & CF361F (For use with
CI370 and 360 INLETS)
3. Refer to Figure 10. Nail bracket to side of stud so
that front edge of bracket is flush to front of stud.
(The bracket may also be nailed to the front edge
of the stud. See face mounting illustrated. For face
mounting, use locating tabs on bracket for proper
alignment.)
FIGURE 10
I N S TA L L ATION IN
396-1
396-3
CI3301RK CI3303RK
X
X
Rough-In and Wall Valve Sold Together
X
X
Rough-In Series
CF329
X
X
X
X
X
X
X
FIGURE 11
4. Refer to Figure 11. Remove cardboard from plaster
guard frame. Using four (4) provided screws, attach
the appropriate flanged fitting and inlet seal to back
of inlet.
5. Replace cardboard in plaster guard frame.
MODEL CF329 (For use
with 330 INLETS)
6. When using Model CF329,
glue elbow to mounting plate.
Attach to stud as shown in
Figure 12.
7
CF361
CF361F
CI395RK
X
X
X
X
FIGURE 12
X
X

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vx1000Vx550cVx475cVx550Vx475

Table of Contents