Final System Check - NuTone VX1000C Installation Instructions Manual

Built-in central cleaning system
Hide thumbs Also See for VX1000C:
Table of Contents

Advertisement

FINAL SYSTEM CHECK

Be sure all inlets are closed and soil bag (for VX475, VX550
& VX1000 models) is in place. Check switch on power unit
for manual on/off operation. Check that indicator light on
side of power unit is lit and is in green mode.
Check each wall inlet to be sure contacts activate power unit
when hose is inserted and switched on, if applicable. If using
CI370 or C1358 Indicating Inlet, be sure LED on inlet is
green when hose is inserted/switched on. If Central
Cleaning hose is not available at the time, a short piece of
wire can be used to short contacts in wall inlet to activate
power unit. Check each wall inlet and tubing connection for
air leaks. Check power unit for leaks around inlet tube and
dirt receptacle.
Make sure the filter bag is properly installed in the power unit
according to directions printed on the bag or in homeowner's
manual. Remove the extra bag and owner's manual from the
power unit dirt receptacle. It may be convenient to store
them with the cleaning tools and accessories.
Now it's time to enjoy the benefits of a NuTone Central
Cleaning System. See Homeowner's Manual for operating
and care information.
34

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vx475Vx550cVx475cVx550Vx1000

Table of Contents