Final System Check - NuTone VX1000C Installation Instructions Manual

Built-in central cleaning system
Hide thumbs Also See for VX1000C:
Table of Contents

Advertisement

F I N A L SYSTEM CHECK
Be sure all inlets are closed and soil bag (for VX475,
VX550 & VX1000 models) is in place. Check switch
on power unit for manual on/off operation. Check that indi-
cator light on side of power unit is lit and is in
green mode.
Check each wall inlet to be sure contacts activate power
unit when hose is inserted and switched on, if applicable.
If using CI370 or C1358 Indicating Inlet, be sure LED on
inlet is green when hose is inserted/switched on. If
Central Cleaning hose is not available at the time, a short
piece of wire can be used to short contacts in wall inlet to
activate power unit. Check each wall inlet and tubing
connection for air leaks. Check power unit for leaks
around inlet tube and dirt receptacle.
Make sure the filter bag is properly installed in the power
unit according to directions printed on the bag or in
h o m e o w n e r's manual. Remove the extra bag and
owner's manual from the power unit dirt receptacle. It
may be convenient to store them with the cleaning tools
and accessories.
Now it's time to enjoy the benefits of a NuTone Central
Cleaning System. See Homeowner's Manual for
operating and care information.
34

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vx1000Vx550cVx475cVx550Vx475

Table of Contents