Installing The Control Cable - Exmark 135-0192 Operator's Manual

Spreader accessory
Table of Contents

Advertisement

1. Aerator 30 side bracket
2. 1/4-20 x 5/8 inch hex
screw
3. 1/4 inch flanged nyloc
nut
4. Aerator 24 side bracket
4

Installing the Control Cable

Parts needed for this procedure:
Procedure
1.
Making sure the cable ball joint is securely
attached to the cable, connect it to the control
arm and secure with a washer and 1/4–28 inch
nyloc nut as shown in Figure 6.
Figure 5
5. 5/16-18 x 1 inch carriage
bolt
6. Reuse nut
7. 1/4-20 x 1 inch carriage
bolt
8. 1/4 inch flanged nyloc
nut
g213563
1. Cable ball joint
2. Control lever
3. 1/4–28 inch nyloc nut
4. Cable mount bracket
2.
Loosen the knob and slide the control cable into
the notch of the mount bracket and tighten the
knob.
3.
Route the other end of the control cable to the
gate arm.
1. 1/4-28 inch nyloc nut
2. Washer
3. Gate arm
4.
Insert the cable end into the hole of the gate arm;
secure the cable end with a washer and 1/4-28
inch nyloc nut (see Figure 7).
11
Setup
Figure 6
5. Knob
6. Washer
7. Jam nut
Figure 7
4. Cable end
5. Hopper bracket
g221603
g213569

Advertisement

Table of Contents
loading

Table of Contents