4 Installing Router Kit components in the installation enclosure
4.6 Installing the Router Kit LAN / LTE in the installation enclosure
32. Pull the cables through the pre-drilled holes at the bottom and secure the cable glands
with the locknuts.
Figure 4-30
33. Wire the elements as shown in the terminal connection diagram.
Figure 4-31
Application example for SIMOTICS CONNECT 400 - Router KitInbetriebnahme- und Montagehandbuch
Attached cable glands
Terminal connection diagram
41