Setting Method - Mitsubishi Electric NZ2GN2S1-16D User Manual

Cc-link ie tsn remote i/o module
Hide thumbs Also See for NZ2GN2S1-16D:
Table of Contents

Advertisement

Setting method

Operation mode
Set the operation mode (synchronous X/Y control mode, synchronization cycle timing control mode) using the function setting
switch 6 and the function setting switch 7 of the I/O module.
Function setting switch 6
Off
Off
On
On
*1 If this combination is set, a MODE switch incorrect (error code: 0107H) occurs.
Setting the synchronization cycle (master station)
Set the synchronization cycle of the master station to any of the following:
• When the cycle is not set in increments of 0.05ms
Set the cycle to 0.88ms, 1.77ms, or 3.55ms.
• When the cycle is set in increments of 0.05ms
Set a value in the range 0.8ms to 10ms.
To use the CC-Link IE Field Network synchronous communication function for the I/O module, enable the CC-Link IE Field
Network synchronous communication function of the master station.
For details on the setting method, refer to the manual for the master station in use.
Function setting switch 7
Off
On
Off
On
8.3 CC-Link IE Field Network Synchronous Communication Function
Operation mode
Synchronous X/Y control mode (factory default)
Synchronization cycle timing control mode
*1
Use prohibited
*1
Use prohibited
8
8 FUNCTIONS
161

Advertisement

Table of Contents
loading

Table of Contents