Belkin OmniView F1DA104Pea User Manual page 18

Pro2 ps/2 switch with on-screen display
Hide thumbs Also See for OmniView F1DA104Pea:
Table of Contents

Advertisement

Installation
Example of Daisy-Chain Configuration:
cable 1
cable 2
cable 3
Connecting the Computers:
9.
Connect all computers to the Master and Slave switches. Refer to
"Single PRO2 PS/2 Installation" on page 10 for instruction on how to
connect the Console and the computers to the PRO2 PS/2.
10. Connect the power supply to the Master switch. Power up the Master
switch. You should see the Master switch light up and display the
digits "00", indicating its BANK address.
11. Power up the Slave switches sequentially, beginning with Bank 01, by
connecting each unit's power supply. Each switch should display its
corresponding BANK address number as it is powered up.
Note:
If the PRO2 PS/2s do not enumerate correctly, reset the Master
switch (BANK 00) by simultaneously pressing the "BANK +" and "BANK
–" buttons. You can also reset the Master switch to detect newly added
Slave switches. If the switches still do not enumerate correctly, check
that all switches have the correct BANK address assigned to them and
that all daisy-chain cables are connected properly.
12. Verify that the Master unit has detected all Slave switches by scrolling
through the BANKS using the BANK up and BANK down buttons. If all
Slave switches are detected properly, the LED display on the Master
switch will register and display the attached Slave switch's BANK
address.
S l
a
v
e
I
n
p
u
t
M s
a ter I
n
p
u
t S / l
a
v
e
O u t u
p t
Master unit
S l
a
v
e
I
n
p
u
t
M s
a ter I
n
p
u
t S / l
a
v
e
O u t u
p t
Slave unit
S l
a
v
e
I
n
p
u
t
M s
a ter I
n
p
u
t S / l
a
v
e
O u t u
p t
Slave unit
S l
a
v
e
I
n
p
u
t
M s
a ter I
n
p
u
t S / l
a
v
e
O u t u
p t
Slave unit
15
(BANK 00)
(BANK 01)
(BANK 02)
(BANK 03)
1
2
2
3
4
5
6
7
8
9
10

Advertisement

Table of Contents
loading

Table of Contents