Step-By-Step Installation Guide - Belkin OmniView F1DA104Pea User Manual

Pro2 ps/2 switch with on-screen display
Hide thumbs Also See for OmniView F1DA104Pea:
Table of Contents

Advertisement

Installation

Step-by-Step Installation Guide

Cautions and Warnings:
Before attempting to connect anything to the PRO2 PS/2 or your
computer(s), please ensure that everything is powered off. Plugging
and unplugging cables while computer(s) are powered on may cause
irreversible damage to the computer(s) and/or the PRO2 PS/2(s). Belkin
Components is not responsible for damage caused in this way.
Installing the PRO2 PS/2 into a Server Rack:
Bracket Installation (F1DA108Pea and F1DA116Pea only)
Eight- or 16-Port PRO2 PS/2s include adjustable mounting brackets ideal
for
installation in 19-inch racks. The mounting brackets feature three
adjustment positions to allow the faceplate of the PRO2 PS/2 to mount
flush to your rack-mounted servers, or to the rack. Please follow these
simple steps to achieve the desired adjustment. The 4-Port PRO2 PS/2
requires an optional mounting kit (F1D005).
1. Remove the adjustable brackets from the box. (The adjustable
brackets allow you to set the PRO2 PS/2's face flush with the ends of
the rails or to extend the PRO2 PS/2 past the front of the rails).
2. Determine how far you would like the PRO2 PS/2 to protrude from the
rack.Select a bracket-hole scheme.
3. Attach the bracket to the side of your PRO2 PS/2 using the Phillips
screws provided. (Refer to diagram above).
4. Mount the PRO2 PS/2 to the rack rail assembly.
Note:
If this PRO2 PS/2 will be daisy-chained to another PRO2 PS/2, set
the BANK address prior to installing on a rack. Refer to the section in this
user manual labeled "Connecting Multiple PRO2 PS/2s (Daisy-Chaining)".
9
1
2
2
3
4
5
6
7
8
9
10

Advertisement

Table of Contents
loading

Table of Contents