Siting and levelling the boiler
Note
A suitable condensate drain must be available in the
installation room if the boiler is installed at ground level
(max. 50 mm above the floor).
Fig. 4
Removing the front panel
The front panel has to be removed to fit the gas supply
pipe, as well as the room sealed set and neutralising
system (accessories).
2.
1.
3.
Fig. 5
±15 mm
Extend the adjustable feet until the castors are free of
load.
Level the boiler with its adjustable feet.
Note
If a neutralising system is being fitted, wind out the
adjustable feet as far as possible.
Note
Special foundations are not required.
1. Tip the front panel forward slightly at the top.
2. Undo the locking screws until the front panel can
be removed.
9