Functional Checks (See Also Chapter 4) - GE LOGIQ 100 PRO Technical Publication

Table of Contents

Advertisement

GE H
EALTHCARE
D
5305880-100, R
IRECTION
10-5-2

Functional Checks (See Also Chapter 4)

The functional checks take about 30 minutes to perform. Refer to the system user documentation
whenever necessary.
10-5-2-1
System Checks
B-Mode
M-Mode
Diagnostic
Control Panel
Measurements
Table 10-7 System Functional Checks
Page 10-8
Ap p r o v e d Do c u m e n t - 5 3 0 5 8 8 0 - 1 0 0 T PH_ r 3 . p d f Pa g e 1 7 9 o f 1 9 7
3
EVISION
Step
Verify basic B-Mode (2D) operation. Check the basic system controls that affect this mode of
operation.
Verify basic M-Mode operation. Check the basic system controls that affect this mode of operation.
System
Perform the Automatic Tests, see section 7-2 on page 7-3, to verify that all boards function
according to specifications.
Perform the Control Panel Test Procedure, see section 7-2-3 on page 7-9, to verify that all keyboard
controls are OK. This is performed by the internal PC (backend processor) which does a normal
Test
keyboard run through.
Monitor
Verify basic Monitor display functions. Refer to Chapter 3 of the User Manual.
Use the measurement controls to verify distance and area calculation accuracy. Refer to the User
Manual, Chapter 18, for measurement accuracy specifications.
Section 10-3 - Periodic Maintenance Schedule
LOGIQ™ 100 PRO S
Description
M
ERVICE
ANUAL

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents