Functional Checks (See Also Chapter 4) - GE Voluson 730Pro Service Manual

Hide thumbs Also See for Voluson 730Pro:
Table of Contents

Advertisement

GE H
- K
EALTHCARE
RETZTECHNIK
D
, R
IRECTION
EVISION
10-5-2

Functional Checks (see also Chapter 4)

The functional checks take about 60 minutes to perform. Refer to the system user documentation
whenever necessary.
10-5-2-1
System Checks
Table 10-5
Step
1
2
3
4
5
6
7
8
9
10
NOTE:
* Some software may be considered standard depending upon system model configuration.
DRAFT (A
System Functional Checks
Item
Verify basic B Mode (2D) operation. Check the basic system controls that affect this mode
B Mode
of operation.
Verify basic M Mode operation. Check the basic system controls that affect this mode of
M Mode
operation.
Verify basic CFM Mode (Color Flow Mode) operation. Check the basic system controls that
C Mode
affect this mode of operation.
Verify basic PD Mode (Power Doppler Mode) operation. Check the basic system controls
PD Mode
that affect this mode of operation.
Verify basic Doppler Mode operation (PW and CW if available). Check the basic system
Doppler Modes
controls that affect this mode of operation.
Verify basic 3D Mode operation. Check the basic system controls that affect this mode of
3D Mode
operation.
*Applicable Software
Verify the basic operation of all optional modes such as CRI, Real Time 4D and VOCAL.
Options
Check the basic system controls that affect each options operation.
Keyboard Test
Perform the Keyboard Test Procedure to verify that all keyboard controls are OK.
Monitor
Verify basic Monitor display functions.
Scan a gray scale phantom and use the measurement controls to verify distance and area
Measurements
calculation accuracy. Refer to the Basic User Manual, Chapter 13, for measurement
accuracy specifications.
Chapter 10 - Care & Maintenance
28, 2008)
PRIL
Description
V
® 730P
/ P
OLUSON
RO
RO
S
ERVICE
V (BT03)
M
ANUAL
10-7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Voluson 730prov

Table of Contents