Install Console Support Weldment; Secure Top Cover To Base - Life Fitness PowerMill 95PS-XX03 Assembly Instructions Manual

Climber
Hide thumbs Also See for PowerMill 95PS-XX03:
Table of Contents

Advertisement

Install Console Support Weldment

1. Place top cap gasket on console support weldment.
2. Route cables up through console support weldment.
3. Secure console support weldment to base.

Secure Top Cover to Base

1. Install plastic grommets into the front panel shroud.
2. Use screws to secure top cover to base.
3. Slide top cap gasket down the console support weldment so it rests flat against the top cover.
Item
1
2
3
M8 X 18mm Hex Washer Head Screw
4
Item
1
Item
1
M4 X 16mm Phillips Pan Head Screw
2
Page 11 of 23
Description
Console Support Weldment
Top Cap Gasket
Cables
18-20 ft. lbs. (24.4-27.1 Nm)
Description
Plastic Grommet
Description
Top Cap Gasket
10 - 12 in. lbs. (1.1 - 1.3 Nm)
Qty.
1
1
4
Qty.
3
Qty.
7
1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powermill 95ps-xx04

Table of Contents