Installing The Switcher; Installation Overview; Mounting The Switcher; Shelf Mounting - Extron electronics SW 4 AR MX HV User Manual

Hide thumbs Also See for SW 4 AR MX HV:
Table of Contents

Advertisement

Installation, cont'd

Installing the Switcher

Installation overview

To install a switcher, perform the following general steps:
If desired, mount the switcher in a rack (see
1
"Mounting the switcher" below).
Turn off power to the input and output devices, and
2
unplug the power cords from them.
Attach the input and output devices to the switcher
3
(see "Cabling the switcher" on page 2-7).
If you are setting up the switcher in looping mode,
4
see "Looping" on page 2-11.
If you are attaching an optional or third-party remote
5
control device, see "Attaching remote control
devices" on page 2-14.
Plug the switcher, input devices, and output device
6
into a grounded AC source, and turn on the input
and output devices.
The image from the selected input device should
7
appear on the output device. If it does not, double-
check steps 3 through 5 and make adjustments as
needed.

Mounting the switcher

All of the switchers can be rack-mounted on a 19-inch shelf
as described below. SW AR MX, SW AR MX HV, and
SW 6 Component switchers can also be mounted in a front
panel, as described on page 2-7.

Shelf mounting

To mount the switcher on a shelf, do the following:
1. Using a small Phillips screwdriver, remove the four
rubber feet from the bottom of the switcher, and
slide the feet off the screws.
2. Place the switcher on the mounting shelf, aligning the
holes on the bottom of the switcher with the holes
on the bottom of the shelf (figure 16).
3. Using the screws you removed in step 1, secure the
switcher to the rack shelf.
4. Secure the rack shelf to the rack with the hardware
provided.
2-6
SW Switchers • Installation
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Figure 16 — Rack mounting a switcher
Panel mount
The SW 6 AR MX HV switcher enclosure is 2.5U high and
requires a 3U-high rack panel (part number 60-141-02).
Other AR MX switchers can be mounted in a rack using
2U-high rack mount panels (#60-141-01). The following
procedure works for both panels.
To panel mount SW AR MX, SW AR MX HV, and
SW 6 Component switchers, do the following:
1. Remove the four corner screws and beveled (dress)
washers from the front of the switcher, and set them
aside.
2. Position the rack panel in front of the switcher, aligning
the holes on the switcher with the corresponding
holes on the panel.
Figure 17 — Panel mounting a switcher
SW Switchers • Installation
2-7

Advertisement

Table of Contents
loading

Table of Contents