Honeywell AS302P Operating Instructions Manual page 88

Single phase smart meter
Table of Contents

Advertisement

84
AS302P Single Phase Smart Meter
____________________________________________________________________
Key Agreement
A means to calculate a shared Key between two parties.
IHD
In-home Display.
IHD Source Device
ESME or the Gas Proxy Function.
IHD Technical Specifications
The document brought into force by the Secretary of State to describe the minimum capabilities of equipment installed to
satisfy the IHD licence conditions.
Import
The flow of electricity into the Premises, and like terms shall be construed accordingly.
LCD
Liquid Crystal Display
Load Switch
A component or combination of components that can close or open (including on receipt of a Command to that effect) to
Enable or Disable the flow of electricity to and from the Premises.
Local Time
The UTC date and time adjusted for British Summer Time.
Lock
To establish a state whereby the Supply is Disabled and can only be Enabled or Armed in response to a Command to Arm
or Enable the Supply; 'Locked' and 'Locking' shall be construed accordingly.
Message Authentication
The process by which the receiver of a message is provided with assurance that the sender is who they claim to be and
that the message is in the form originally sent.
MPAN
Meter Point Administration Number.
MPRN
Meter Point Reference Number.
Non-Disablement Period
A period of time during which the combined credit of the meter balance and Emergency Credit balance falling below the
disablement threshold will not be cause the Supply to be Disabled when ESME or GSME is operating in Prepayment
Mode.
Outcome
The result of executing a Command, expressed as success or failure.
Payment-based Debt Recovery
A means of recovering debt based on a percentage of a payment.
Personal Data
Any information comprising Personal Data as such term is defined in the Data Protection Act 1998 at the date the SMETS
is brought into force.
PIN
Personnel Identification Number
PPMID Technical Specifications
The document brought into force by the Secretary of State to describe the minimum capabilities of equipment installed to
satisfy the PPMID licence conditions.
© Honeywell - M450 001 1D - 23.05.2019

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents