Boost Functionality; Alcs Event Log - Honeywell AS302P Operating Instructions Manual

Single phase smart meter
Table of Contents

Advertisement

__________________________________________________________________________

24.4. Boost Functionality

The meter has the functionality that allows the Customer to turn on the ALCS / HCALCS for a period of time. This will only
be possible if the meter has been configured so that a particular ALCS / HCALCS will operate in accordance with the
Boost Switch. This configuration can be done and changed at any time from the DCC. All ALCS / HCALCS configured to
operate in accordance with the Boost Button will operate simultaneously i.e. there will be no local option to individually
select which ALCS / HCALCS will operate.
The Boost Function is initiated by pressing the Push Buttons when the meter is displaying an appropriate display (or from a
Type 1 Device).
The Boost Function will allow the ALCS / HCALCS to be switched on for either 15, 30, 45 or 60 minutes after which time
the ALCS / HCALCS will revert to normal operation (using the ALCS Switching Calendar). If the auxiliary is closed by the
boost functionality the top right hand 5 characters of the display will show 'boost'.
Once Boost is selected the following options are available:
Cancel the Boost
Extend the Boost by 15, 30, 45 mins, providing the total boost time of 60mins is not exceeded
If a Power Outage occurs during a Boost Period then the meter will stop the Boost Period in line with the current amount of
boost select e.g., if the meter had a Boost Period configured from 7:30 to 8:00 (30min Boost) and there was a Power Cut
from 7:40 to 7:50 then the Boost Period still finishes at 8:00.
While Boost functionality is active there will be 2 displays added to the General Display Menu:
Activate Boost:
Choose one of the available periods: 15, 30, 45 or 60.
Use "NEXT" button to navigate between options.
Use Long press on "SELECT" button to active a boost period. After the Boost period is activated the meter will display a
message: Activate with XX min
Extend Boost:
Choose one of the possible available periods: 15, 30 or 45.
Use "NEXT" button to navigate between options.
Use Long press on "SELECT" button to extend the boost period. After the Boost period is extended the meter will display a
message: Extend with XX min
Cancel Boost:
Use Long press on "SELECT" button to cancel the boost period. After the Boost period is cancelled the meter will display a
message: Boost cancelled
Entries in the Boost Log will be made for:
Every time the Boost Functionality is Activated including Start and Finish Time
Every time the Boost Functionality is Cancelled including Start and Finish Time (both values are the same)
Every time the Boost is Extended including Start and Finish Time

24.5. ALCS Event Log

Entries in ALCS Event Log are triggered by the following actions:
A switch in Auxiliary Load Control Switch Calendar
On receipt of a Request Control of HAN Connected Auxiliary Load Control Switch command (this represents
the command received by the meter from HCALCS)
On receipt of a Reset HAN Connected Auxiliary Load Control Switch [n] State command (Give control back to
Calendar)
On receipt of a Set HAN Connected Auxiliary Load Control Switch [n] State command (Open or Close)
execution of Test Auxiliary Load Control Switch [n] command
All commands, except the third one (Revert to Calendar), have as a result two entries captured in the ALCS event log
(Revert to Calendar triggers three entries).
© Honeywell - M450 001 1D - 23.05.2019
Operating & Maintenance Instructions
41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents