Alternative Confi Guration; Assembly - Husky MR482478W5 Use And Care Manual

5-shelf heavy-duty storage unit
Table of Contents

Advertisement

Assembly Options (continued)
ALTERNATE CONFIGURATION
This shelf unit can be split into two units side by side. Couplers are not required. Position the beams and braces in the top and bottom
two post holes of each section for stability.
Vertical Configuration

Assembly

1
Preparing for assembly
□ Check that each post (C) is in the proper orientation.
□ Position the post (C) so that the tapered end of the hole is
pointing downward.
□ Place the post feet (G) on the bottom of each of the four
lower posts (C).
□ Check that the fl at surface of the beam (A) and brace (B)
ledge is facing in the desired orientation.
Horizontal Configuration
C
G
5
Please contact 1-888-43-HUSKY for further assistance.
A
Post slot points down
HUSKYTOOLS.COM

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mr602478w5672-405672-141

Table of Contents