IBM TotalStorage FAStT700 User Manual page 76

Fibre channel storage server
Hide thumbs Also See for TotalStorage FAStT700:
Table of Contents

Advertisement

5. Unpack the new mini hub and slide it into the appropriate slot; then, tighten the
6. Install the SFP modules that you removed in Step 3a on page 54 as follows:
7. Replace the fiber-optic cables that you removed in Step 1 on page 56.
8. Check the indicator lights on the mini hub.
®
58
IBM
TotalStorage
FAStT700 Fibre Channel Storage Server: User's Guide
captive screw.
a. Remove the SFP modules from their static-protective packages.
b. Remove the protective caps from the SFP modules.
c. Slide the SFP modules into the mini-hub ports.
When the mini hub is operating properly, the green loop good light is lit and the
fault light is off. If the mini-hub port is active, the amber port bypass light is not
lit. For more information see "Mini-hub indicator lights" on page 27. If a problem
is indicated, use the storage-management software to check the FAStT700
Storage Server status.

Advertisement

Table of Contents
loading

Table of Contents