Transport And Warehousing; Packing; Transport; Warehousing - ECM Casa V User Manual

Table of Contents

Advertisement

Available languages

Available languages

7.
Clean the groove before inserting
the new group gasket
The steam/ hot water nozzle is blocked
Clean the holes of the steam/ hot water nozzle carefully with a needle or with a paper clip.
For this purpose, the steam nozzle may also be unscrewed.
Replace the steam/ hot water nozzle.
8

TRANSPORT AND WAREHOUSING

8.1 Packing

The CASA V is delivered in a special carton and protected by a plastic cover and foam.
Caution!
Keep packing out of reach of children!
Important!
Keep packing and packing material for possible transport! Do not throw it away!

8.2 Transport

• Transport the machine only upright, if possible on a pallet.
• Do not tilt or turn the machine over.
• Do not stack more than three units on top of each other.
• Do not place other heavy items on the packing.

8.3 Warehousing

• Keep the machine packed in a dry place.
• Do not stack more than three units on top of each other.
• Do not place other heavy items on the packing.
9

DISPOSAL

This product complies with EU Directive 2012/19/EU and is registered according to WEEE (Waste Electrical
and Electronic Equipment).

10 CE CONFORMITY

Conformity
Translation of the original German user manual
8.
Insert the new group gasket with
the rounded side facing upwards
WEEE Reg.-Nr.: DE69510123
9.
Replace the gasket of the shower
tray (see point 4) and the shower
plate
ENGLISH
24

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

80045

Table of Contents