Base Station Cable Measurement

Measuring cable delays
DECT - Installation Manual
38HBKD0001SAH – Issue 14 (27th October 2003)
The cable distance between the Control Unit and the Base Stations
introduce signal delays for which the system must adjust. Whenever a
Base Station is added or moved, a process of measuring the cable delays
must be performed.
Note: During this process all the handsets lock for a few minutes and the
system will do a reset.
1. Start CCFP (see page 31).
2. Select Options and then Preferences.
3. Click on the Base Station Status tab.
4. The page shows the current status of the base stations and the
measured cable delays. Options exist to select and measure specific
cable delays or to select and measure all cable delays.
5. To re-measure selected cable delays, tick the appropriate box and
click on Measure RFP Cable Delay (Chosen). To re-measure the all
cable delays click on Measure RFP Cable Delay (All).
Installation - Page 23
Base Station Cable Measurement
Page 23