Figure 6-3 Time Sequence Chart For The 11 Res_Recv Fb - Siemens SIMATIC S7-400 CP 440 Installation And Parameter Assignment

Point-to-point connection
Table of Contents

Advertisement

Communication via Function Blocks
6.3 Using the Function Blocks
Time Sequence Chart for the RES_RECV FB
The figure below illustrates the behavior of the DONE and ERROR parameters, depending
on how the REQ and R inputs are wired.
Figure 6-3
Note
The REQ input is edge-triggered. A positive edge at the REQ input is adequate. It is not
required that the RLO (result of logical operation) is "1" during the whole transmission
procedure.
100
www.gkbpx.com
Time Sequence Chart for the 11 RES_RECV FB
Point-to-point connection CP 440 Installation and Parameter Assignment