Kohler PRELUDE K-8266T Manual page 7

Enameled cast iron bath
Table of Contents

Advertisement

INSTALL THE GRIP RAIL
INSTALL THE GRIP RAIL
For baths with K-8645-CP.
Place the gasket (6) onto the grip rail(7). Make sure the
gasket is matching the contour of the grip rail. Position
the grip rail with gasket so that the hole lines up with
the hole on the nut pre-installed on the side of bath tub.
Note: the smaller side of the grip rail is on the drain
side of the tub.
Thread the screw (8) into the hole of the grip rail.
Tighten the screw snugly to secure the grip rail. Snap
the cap (9) into each hole.
Repeat above procedures for the other grip rail.
K-8645-CP
(6)
(7)
(8)
(9)
COMPLETE FINISH WALL
COMPLETE FINISH WALL
CAUTION: Risk of product damage. Do not support
the weight of the bath by the rim.
Install the ceramic or marble tiles. Seal the joints
between the bath rim and the finished tiled wall using
silicone sealant. RTV (Room Temperature Vulcanizing)
sealant is recommended.
Apply a bead of silicone sealant over the seam
between the bath apron and the finish floor.
!!
(
116867-T01-B
)
7
7
8
9
6
Silicone Filler
Bath
8
6
Finished Tiled Wall
Paste Mortar
Brick or Concrete Wall
Framing Construction

Advertisement

Table of Contents
loading

Table of Contents