BEFORE YOU BEGIN
BEFORE YOU BEGIN
A. Introduction
!
Please read these instructions carefully to
familiarize yourself with the required tools, materials,
and installation sequences. Follow the sections that
pertain to your particular installation. This will help
you avoid costly mistakes. In addition to proper
installation, read all operating and safety instructions.
!
All information is based on the latest product
information available at the time of publication.
Kohler China Ltd. reserves the right to make
changes in product characteristics, packaging, or
availability at any time without notice.
!
These instructions contain important care, cleaning,
and warranty information-please leave these
instructions for the consumer.
B. Installer Hazard Notification
CAUTION!!
Risk of personal injury.
Cast iron baths are extremely heavy. Wear appropriate
safety equipment when installing these products.
NOTICE:
Observe all local plumbing codes.
PRODUCT REQUIREMENTS
A. Summary Of Key Requirements
!
Observe all local plumbing codes.
!
Install the unit to a level subfloor.
!
Provide properly-dimensioned framing.
!
Baths are designed for a variety of installations,
depending upon the model chosen.
B. Product Inspection
Uncrate and inspect bath for damage. Leave all
materials in the crate during construction to prevent
damage.
1046553-T01-B
A.
!
!
!
B.
A.
!
!
!
!
B.
368
201419
ã
Copyright Kohler China Ltd., 2005
C
1
BIOVE
K-8277T/K-8277T-GR
BLISS
K-17270T/K-17270T-GR
ENAMELED CAST IRON BATH
INSTALLATION INSTRUCTIONS
, 2005

Advertisement

Table of Contents
loading

Summary of Contents for Kohler BIOVE K-8277T-GR

  • Page 1 All information is based on the latest product information available at the time of publication. Kohler China Ltd. reserves the right to make changes in product characteristics, packaging, or availability at any time without notice.
  • Page 2 ROUGHING-IN A. Roughing-in Note Fixture dimensions are nominal and conform to tolerances in ASME/ANSI Standard A112.19.1M. A112.19.1M B. Determine Roughing-in Measure the height, width, and depth of the bath. Verify these dimensions with those on this page. Allow clearance at the drain hole location in the flooring. BLISS UNIT: mm K-17270T/K-17270T-GR...
  • Page 3: Installation Requirements

    C. Accessory Information K-17270T/K-17270T-GR K-17270T/K-17270T-GR Drain ............K-17295T-CP ............K-17295T-CP Grip Rail ..........K-17275T-CP .............K-17275T-CP K-8277T/K-8277T-GR K-8277T/K-8277T-GR Drain ............K-17295T-CP .............K-17295T-CP Grip Rail ..........K-8278T-38R ............K-8278T-38R INSTALLATION REQUIREMENTS INSTALLATION REQUIREMENTS A. Tools Required B. Materials Required Adjustable pipe Plumbers putty wrench Wall coverings, as Rule necessary Level Silicone sealant...
  • Page 4: Before Installing Unit

    BEFORE INSTALLING UNIT BEFORE INSTALLING UNIT A. The following installation practices must be followed to avoid any potential damage to the enamel finish. WARNING: Failure to follow the manufacturer's recommended installation method may result in damage to the enamel surface. ·...
  • Page 5 INSTALL THE BATH INSTALL THE BATH A1. Installation of Bath with Adjustable Height Level Slide the new bath into position. Insert the drain tailpiece into the trap. Level the bath by positioning metal shims and bricks under the bath feet and ensure there is enough spate for the drain.
  • Page 6 Use 25~30 Kg dry cement and sand mix. Add water to make a paste mortar. Remove the tub. Cover the Level installation area with the mortar starting from the middle of the tub as shown. The height of the mortar should reach the bottom of the tub.
  • Page 7 C. Finish Bath Area Construction NOTE: An access panel is essential for future maintenance. Possible framing arrangements are illustrated below. Use the framing construction appropriate for your particular bath model. Some modifications may be needed for other types of construction, if preferred. If an apron wall without a ledge is desired, the finished apron wall surface must be 2 mm under the bath rim.
  • Page 8: Complete Finish Wall

    COMPLETE FINISH WALL COMPLETE FINISH WALL Finished Tiled Wall CAUTION: Risk of product damage. Do not support the weight of the bath by the rim. Paste Mortar Install the ceramic or marble tiles. Seal the joints Brick or Concrete Wall Silicone Filler between the bath rim and the finished tiled wall using silicone sealant.
  • Page 9: Limited One-Year Warranty

    This product is warranted for one year from date of purchase. Kohler China will be responsible for any problems caused by manufacturing defects provided with the invoice. Kohler China will, at its election, repair, replace or make appropriate adjustment where Kohler China inspection discloses any such defects occurring in normal usage within one year after purchase.

This manual is also suitable for:

Bliss k-17270t-grBiove k-8277tBliss k-17270t

Table of Contents