Kohler PRELUDE K-8266T Manual page 4

Enameled cast iron bath
Table of Contents

Advertisement

UNIT: mm
:
silicone filler
tiling
B. Partially Install Bath Drain
Install the drain on the bath according to the drain
manufactuer's instructions.
INSTALL THE BATH
INSTALL THE BATH
A1. Installation of Bath with Adjustable
Hlight
Slide the new bath into position.
Insert the drain tailpiece into the trap.
Level the bath by positioning metal shims and bricks
under the bath feet and ensure there is enough spate
for the drain. Attention: the metal shims are necessary
to aroid cracking of bricks. Check for level along the top
of the side of the bath and across the drain end. The
bath may have to be moved in and out of the recess
area until it is shimmed properly, if the support feet are
not accessible from the back or side.
A1.
A2. Through the Floor Drain Bath
Installation
)
1 . Slide the new bath into position to verify the drain
location and the stud fit. Cut a minimum 152
mm hole in the floor for the drain connection.
A2.
)
1 .
305mm
116867-T01-B
bath
4
wall
1
:
silicone filler
4
tiling
2
B.
305
152
4
2
bath
wall
wall
Level
Brick
Metal shim
bath
4
silicone filler
3

Advertisement

Table of Contents
loading

Table of Contents