NOTE:
The DC power supplies in slots PEM0 and PEM1 must be powered by dedicated power feeds derived
from feed A, and the DC power supplies in PEM2 and PEM3 must be powered by dedicated power feeds
derived from feed B. This configuration provides the commonly deployed A/B feed redundancy for the
system. For information about connecting to DC power sources, see DC Power Supply Electrical Specifications
for the EX9214 switch.
12. Verify that the INPUT 0 OK or INPUT 1 OK LEDs on the power supply are lit green steadily. If using two feeds, verify
that both INPUT 0 OK and INPUT 1 OK LEDs on the power supply are lit steadily. The INPUT OK is lit amber if the
voltage at that input is in reverse polarity. Check the polarity of the power cables to fix the condition.
13. Set the power switch of the DC power supply to the ON (|) position.
14. Verify that the that the DC OK LED is lit green steadily.

Step 2: Up and Running

IN THIS SECTION

Set Parameter Values | 9

Perform the Initial Configuration | 10
Set Parameter Values
Before you begin:
Ensure that the switch is powered on.
Set these values in the console server or PC: baud rate—9600; flow control—none; data—8; parity—none; stop bits—1;
DCD state—disregard.
For management console, connect the CON port of the Routing Engine (RE) module to the PC using the RJ-45 to DB-9
serial port adapter.
For Out-of-Band management, connect the ETHERNET port of the RE module to the PC using an RJ-45 cable.