IBM Power System E950 User Manual page 65

Memory modules for the 9040-mr9
Hide thumbs Also See for Power System E950:
Table of Contents

Advertisement

Figure 36. Inserting a memory riser
5. Repeat steps "3" on page 49 - "4" on page 50 for each memory riser.
Preparing the 9040-MR9 system for operation after installing a memory riser
To prepare the system for operation after you install a memory riser, complete the steps in this
procedure.
Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. Replace the service access cover.
a) Lower the cover (A) onto the system unit. Ensure that the cover alignment pins (C) on each side of
the cover fit into the matching slots in the chassis.
b) Slide the cover (A) onto the system unit. Ensure that the tabs (D) tuck under the mesh along the
front opening of the chassis.
c) Close the release latches (B) by pushing it in the direction that is shown in the following figure.
Memory riser for the 9040-MR9 51

Advertisement

Table of Contents
loading

This manual is also suitable for:

9040-mr9

Table of Contents