  • Page 1 Power Systems Memory modules for the 9040-MR9...
  • Page 2 Note Before using this information and the product it supports, read the information in “Safety notices” on page v, “Notices” on page 81, the IBM Systems Safety Notices manual, G229-9054, and the IBM Environmental Notices and User Guide, Z125–5823. ®...
  • Page 3: Table Of Contents

    Preparing the system to permanently remove a memory riser............70 Permanently removing a memory riser from the system..............75 Preparing the system for operation after permanently removing a memory riser......77 Notices........................81 Accessibility features for IBM Power Systems servers................82 Trademarks..............................83 Privacy policy considerations ........................83 Electronic emission notices........................83 Class A Notices.............................
  • Page 5: Safety Notices

    Das Produkt ist nicht für den Einsatz an Bildschirmarbeitsplätzen im Sinne § 2 der Bildschirmarbeitsverordnung geeignet. Laser safety information IBM servers can use I/O cards or features that are fiber-optic based and that utilize lasers or LEDs. Laser compliance IBM servers may be installed inside or outside of an IT equipment rack.
  • Page 6 – For racks with a DC power distribution panel (PDP), connect the customer’s DC power source to the PDP. Ensure that the proper polarity is used when attaching the DC power and DC power return wiring. • Connect any equipment that will be attached to this product to properly wired outlets. •...
  • Page 7 • Rack-mounted devices are not to be used as shelves or work spaces. Do not place objects on top of rack-mounted devices. In addition, do not lean on rack mounted devices and do not use them to stabilize your body position (for example, when working from a ladder). •...
  • Page 8 CAUTION: Removing components from the upper positions in the rack cabinet improves rack stability during relocation. Follow these general guidelines whenever you relocate a populated rack cabinet within a room or building. • Reduce the weight of the rack cabinet by removing equipment starting at the top of the rack cabinet.
  • Page 9 DANGER: Rack-mounted devices are not to be used as shelves or work spaces. Do not place objects on top of rack-mounted devices. In addition, do not lean on rack-mounted devices and do not use them to stabilize your body position (for example, when working from a ladder). Stability hazard: •...
  • Page 10 DANGER: Multiple power cords. The product might be equipped with multiple AC power cords or multiple DC power cables. To remove all hazardous voltages, disconnect all power cords and power cables. (L003) (L007) CAUTION: A hot surface nearby. (L007) x Power Systems: Power Systems: Memory...
  • Page 11 Exchange only with the IBM-approved part. Recycle or discard the battery as instructed by local regulations. In the United States, IBM has a process for the collection of this battery. For information, call 1-800-426-4333. Have the IBM part number for the battery unit available when you call.
  • Page 12 • LIFT TOOL intended for use to assist, lift, install, remove units (load) up into rack elevations. It is not to be used loaded transporting over major ramps nor as a replacement for such designated tools like pallet jacks, walkies, fork trucks and such related relocation practices. When this is not practicable, specially trained persons or services must be used (for instance, riggers or movers).
  • Page 13 Freewheeling will cause uneven cable wrapping around winch drum, damage cable, and may cause serious injury. • This TOOL must be maintained correctly for IBM Service personnel to use it. IBM shall inspect condition and verify maintenance history before operation. Personnel reserve the right not to use TOOL if inadequate.
  • Page 14 xiv Power Systems: Power Systems: Memory...
  • Page 15: Memory Modules

    Memory modules for the 9040-MR9 ® Find information about installing, removing, and replacing the memory modules in the IBM Power System E950 (9040-MR9) server. Installing memory modules in the 9040-MR9 system Find information about installing, removing, and replacing memory modules in the IBM Power System E950 (9040-MR9) server.
  • Page 16 Use the blue identify LED on the enclosure to locate the system. Ensure that the serial number of the system matches the serial number to be serviced. 2. Stop the system. For instructions, see Stopping a system (www.ibm.com/support/knowledgecenter/ POWER9/p9haj/crustopsys.htm). 3. Label and disconnect all external cables that are attached to the PCIe adapters.
  • Page 17 Figure 1. Removing the power cords (L003) Memory modules for the 9040-MR9 3...
  • Page 18 DANGER: Multiple power cords. The product might be equipped with multiple AC power cords or multiple DC power cables. To remove all hazardous voltages, disconnect all power cords and power cables. (L003) 5. Complete the following steps to place the system in the service position. 4 Power Systems: Power Systems: Memory...
  • Page 19 Do not pull out or install any drawer or feature if the rack stabilizer brackets are not attached to the rack. Do not pull out more than one drawer at a time. The rack might become unstable if you pull out more than one drawer at a time.
  • Page 20 Attention: • Attach an electrostatic discharge (ESD) wrist strap to the front ESD jack, to the rear ESD jack, or to an unpainted metal surface of your hardware to prevent the electrostatic discharge from damaging your hardware. • When you use an ESD wrist strap, follow all electrical safety procedures. An ESD wrist strap is used for static control.
  • Page 21 Figure 3. Removing the service access cover 8. Remove the memory riser. a) Open the release latches (A) on the memory riser as shown in the following figure. Open the latches to the fully upright 90 degree position. b) Pull out the memory riser from the slot by holding onto the latches. Memory modules for the 9040-MR9 7...
  • Page 22 Figure 4. Removing a memory riser Installing memory modules in the 9040-MR9 system To install memory module into a memory riser, complete the steps in this procedure. Procedure 1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged into a ground jack or connected to an unpainted metal surface.
  • Page 23 c) Retain the removed memory module filler so that you can use it to fill up an empty slot, if required. 4. Grasp the new memory module along its edges and align it with the slot. Attention: Memory modules are keyed to prevent a memory module from being installed incorrectly.
  • Page 24 d) Rotate the release latches into the closed position, and press the release latches down to ensure that the memory riser is fully seated into the connector. Figure 6. Inserting a memory riser 3. Replace the service access cover. a) Lower the cover (A) onto the system unit. Ensure that the cover alignment pins (C) on each side of the cover fit into the matching slots in the chassis.
  • Page 25 Figure 7. Installing the service access cover 4. Complete the following steps to place the system in the operating position. a. Unlock the blue rail safety latches (A) by pushing them towards the front as shown in the following figure. b.
  • Page 26 Figure 8. Placing the system into the operating position 5. Using your labels, reconnect all of the external cables that plug into the PCIe adapters. 6. Using your labels, reconnect the power cords (A) to the system unit as shown in the following figure. Fasten the power cords to the system by using the hook-and-loop fasteners (B) as shown in the following figure.
  • Page 27 Figure 9. Connecting the power cords 7. Start the system. For instructions, see Starting a system (www.ibm.com/support/knowledgecenter/ POWER9/p9haj/crustartsys.htm). 8. Turn off the identify LED. For instructions, see Deactivating an identify LED (www.ibm.com/support/ knowledgecenter/POWER9/p9haj/p9haj_turn_off_identify_led.htm). 9. Verify the installed part. • If you replaced the part because of a service action, verify the installed part. For instructions, see Verifying a repair (www.ibm.com/support/knowledgecenter/POWER9/p9ect/...
  • Page 28 Removing and replacing memory modules in the 9040-MR9 system Find information about removing and replacing memory modules in the IBM Power System E950 (9040- MR9) server. About this task If your system is managed by the Hardware Management Console (HMC), use the HMC to repair a part in the system.
  • Page 29 Use the blue identify LED on the enclosure to locate the system. Ensure that the serial number of the system matches the serial number to be serviced. 2. Stop the system. For instructions, see Stopping a system (www.ibm.com/support/knowledgecenter/ POWER9/p9haj/crustopsys.htm). 3. Label and disconnect the power source from the system by unplugging the power cords from the system.
  • Page 30 16 Power Systems: Power Systems: Memory...
  • Page 31 DANGER: Multiple power cords. The product might be equipped with multiple AC power cords or multiple DC power cables. To remove all hazardous voltages, disconnect all power cords and power cables. (L003) 4. Label and disconnect all external cables that are attached to the PCIe adapters. 5.
  • Page 32 Figure 11. Placing the system in service position 6. Attach the electrostatic discharge (ESD) wrist strap. The ESD wrist strap must be connected to an unpainted metal surface until the service procedure is completed, and if applicable, until the service access cover is replaced. Attention: •...
  • Page 33 a. Push the release latches (A) in the direction shown in the following figure. b. Slide the cover (B) off the system unit as shown in the following figure. When the front of the service access cover has cleared the upper frame ledge, lift the cover up and off the system unit. Figure 12.
  • Page 34 Figure 13. Activating the identify LED 9. Locate the amber LED for the memory riser for the failed memory module. Make a note of which memory riser is lit; that indicates the memory module to replace. Figure 14 on page 21 shows the locations (A) of the memory riser LEDs. 20 Power Systems: Power Systems: Memory...
  • Page 35 Figure 14. LEDs for a memory riser If the locator function does not work, you will need to use the event log information to locate the memory riser to remove. 10. To remove the memory riser that was identified, complete the following steps: a) Open the release latches (A) on the memory riser as shown in the following figure.
  • Page 36 Figure 15. Removing a memory riser 11. Place the memory riser on an electrostatic discharge (ESD) mat. Removing a memory module from the 9040-MR9 system To remove a memory module from the system, complete the steps in this procedure. Procedure 1.
  • Page 37 Figure 16. Identifying a memory module 3. To unlock the memory module from its connector, simultaneously push both of the locking tabs away from the module in the direction that is shown in Figure 17 on page 24. The lever action of the tabs pushes the memory module out of the connector. If you find it hard to open the tabs with your fingers, you may use the tips of ball point pens, or the eraser ends of pencils.
  • Page 38: Removing A Memory Module

    Figure 17. Removing a memory module 4. Hold the memory module by the edges and pull it out of the system. 5. If the removed part is used again, place the part on an electrostatic discharge (ESD) mat. Replacing a memory module in the 9040-MR9 system To replace a memory module in the system, complete the steps in this procedure.
  • Page 39: Replacing A Memory Module

    Figure 18. Replacing a memory module Preparing the 9040-MR9 system for operation after removing and replacing a memory module To prepare the system for operation after you remove and replace a memory module, complete the steps in this procedure. Procedure 1.
  • Page 40 Figure 19. Inserting a memory riser 3. Replace the service access cover. a) Lower the cover (A) onto the system unit. Ensure that the cover alignment pins (C) on each side of the cover fit into the matching slots in the chassis. b) Slide the cover (A) onto the system unit.
  • Page 41 Figure 20. Installing the service access cover 4. Complete the following steps to place the system in the operating position. a. Unlock the blue rail safety latches (A) by pushing them towards the front as shown in the following figure. b.
  • Page 42 Figure 21. Placing the system into the operating position 5. Push the system unit (B) back into the rack until both release latches of the system unit lock into position. Secure the cable management arm with hook-and-loop fasteners around the back side of the cable management arm, but not around the cables.
  • Page 43 (www.ibm.com/support/knowledgecenter/POWER9/p9haj/pxhaj_hsmverify.htm). Plugging rules for memory modules in the 9040-MR9 system Find information about the configurations and rules that apply to memory modules for the IBM Power System E950 (9040-MR9) server. This information describes the rules for memory modules in the system.
  • Page 44 – Add a second memory riser card to system processor CP1, then to system processor CP2, and finally to system processor CP3. Permanently removing memory modules from the 9040-MR9 system Find information about permanently removing memory modules from the IBM Power System E950 (9040-MR9) server. About this task If your system is managed by the Hardware Management Console (HMC), use the HMC to repair a part in the system.
  • Page 45 Use the blue identify LED on the enclosure to locate the system. Ensure that the serial number of the system matches the serial number to be serviced. 2. Stop the system. For instructions, see Stopping a system (www.ibm.com/support/knowledgecenter/ POWER9/p9haj/crustopsys.htm). 3. Label and disconnect the power source from the system by unplugging the power cords from the system.
  • Page 46 Figure 23. Removing the power cords (L003) 32 Power Systems: Power Systems: Memory...
  • Page 47 DANGER: Multiple power cords. The product might be equipped with multiple AC power cords or multiple DC power cables. To remove all hazardous voltages, disconnect all power cords and power cables. (L003) 4. Label and disconnect all external cables that are attached to the PCIe adapters. 5.
  • Page 48 Do not pull out or install any drawer or feature if the rack stabilizer brackets are not attached to the rack. Do not pull out more than one drawer at a time. The rack might become unstable if you pull out more than one drawer at a time.
  • Page 49 Attention: • Attach an electrostatic discharge (ESD) wrist strap to the front ESD jack, to the rear ESD jack, or to an unpainted metal surface of your hardware to prevent the electrostatic discharge from damaging your hardware. • When you use an ESD wrist strap, follow all electrical safety procedures. An ESD wrist strap is used for static control.
  • Page 50 Figure 25. Removing the service access cover 8. Remove the memory riser from which you will remove memory modules. a) Open the release latches (A) on the memory riser as shown in the following figure. Open the latches to the fully upright 90 degree position. b) Pull out the memory riser from the slot by holding onto the latches.
  • Page 51 Figure 26. Removing a memory riser Permanently removing a memory module from the 9040-MR9 system To permanently remove memory modules from the system, complete the steps in this procedure. Procedure 1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged into a ground jack or connected to an unpainted metal surface.
  • Page 52 Figure 27. Removing a memory module 3. Hold the memory module by the edges and pull it out of the system. 4. If the removed part is used again, place the part on an electrostatic discharge (ESD) mat. 5. Insert a memory module filler. Note: The memory module slots must contain either a memory module or a filler to ensure proper cooling.
  • Page 53 a) Ensure the release latches (A) are fully open to a 90 degree angle as shown in the following figure. b) Align the memory riser with the connector. c) Press the memory riser firmly into the connector. d) Rotate the release latches into the closed position, and press the release latches down to ensure that the memory riser is fully seated into the connector.
  • Page 54 Figure 29. Installing the service access cover 4. Complete the following steps to place the system in the operating position. a. Unlock the blue rail safety latches (A) by pushing them towards the front as shown in the following figure. b.
  • Page 55 Figure 30. Placing the system into the operating position 5. Using your labels, reconnect all of the external cables that plug into the PCIe adapters. 6. Using your labels, reconnect the power cords (A) to the system unit as shown in the following figure. Fasten the power cords to the system by using the hook-and-loop fasteners (B) as shown in the following figure.
  • Page 56 Figure 31. Connecting the power cords 7. Start the system. For instructions, see Starting a system (www.ibm.com/support/knowledgecenter/ POWER9/p9haj/crustartsys.htm). 8. Turn off the identify LED. For instructions, see Deactivating an identify LED (www.ibm.com/support/ knowledgecenter/POWER9/p9haj/p9haj_turn_off_identify_led.htm). 42 Power Systems: Power Systems: Memory...
  • Page 57: Memory Riser

    E950 (9040-MR9) server. Installing a memory riser in the 9040-MR9 system Find information about installing a memory riser in the IBM Power System E950 (9040-MR9) server. About this task Before you install a feature, ensure that the software that is required to support the feature is installed on your system.
  • Page 58 Use the blue identify LED on the enclosure to locate the system. Ensure that the serial number of the system matches the serial number to be serviced. 2. Stop the system. For instructions, see Stopping a system (www.ibm.com/support/knowledgecenter/ POWER9/p9haj/crustopsys.htm). 3. Label and disconnect the power source from the system by unplugging the power cords from the system.
  • Page 59 Figure 32. Removing the power cords (L003) Memory riser for the 9040-MR9 45...
  • Page 60 DANGER: Multiple power cords. The product might be equipped with multiple AC power cords or multiple DC power cables. To remove all hazardous voltages, disconnect all power cords and power cables. (L003) 4. Label and disconnect all external cables that are attached to the PCIe adapters. 5.
  • Page 61 Do not pull out or install any drawer or feature if the rack stabilizer brackets are not attached to the rack. Do not pull out more than one drawer at a time. The rack might become unstable if you pull out more than one drawer at a time.
  • Page 62 Attention: • Attach an electrostatic discharge (ESD) wrist strap to the front ESD jack, to the rear ESD jack, or to an unpainted metal surface of your hardware to prevent the electrostatic discharge from damaging your hardware. • When you use an ESD wrist strap, follow all electrical safety procedures. An ESD wrist strap is used for static control.
  • Page 63 Figure 34. Removing the service access cover Installing a memory riser in the 9040-MR9 system To install memory riser cards in a system, complete the steps in this procedure. Procedure 1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged into a ground jack or connected to an unpainted metal surface.
  • Page 64 Figure 35. Removing a memory riser filler 4. To insert the memory riser, complete the following steps: a) Ensure the release latches (A) are fully open to a 90 degree angle as shown in the following figure. b) Align the memory riser with the connector. c) Press the memory riser firmly into the connector.
  • Page 65 Figure 36. Inserting a memory riser 5. Repeat steps “3” on page 49 - “4” on page 50 for each memory riser. Preparing the 9040-MR9 system for operation after installing a memory riser To prepare the system for operation after you install a memory riser, complete the steps in this procedure.
  • Page 66 Figure 37. Installing the service access cover 3. Complete the following steps to place the system in the operating position. a. Unlock the blue rail safety latches (A) by pushing them towards the front as shown in the following figure. b.
  • Page 67 Figure 38. Placing the system into the operating position 4. Using your labels, reconnect the power cords (A) to the system unit as shown in the following figure. Fasten the power cords to the system by using the hook-and-loop fasteners (B) as shown in the following figure.
  • Page 68 5. Using your labels, reconnect all of the external cables that plug into the PCIe adapters. 6. Start the system. For instructions, see Starting a system (www.ibm.com/support/knowledgecenter/ POWER9/p9haj/crustartsys.htm). 7. Turn off the identify LED. For instructions, see Deactivating an identify LED (www.ibm.com/support/ knowledgecenter/POWER9/p9haj/p9haj_turn_off_identify_led.htm). 8. Verify the installed part.
  • Page 69 Removing and replacing a memory riser in the 9040-MR9 system Find information about removing and replacing a memory riser in the IBM Power System E950 (9040- MR9) server. About this task If your system is managed by the Hardware Management Console (HMC), use the HMC to repair a part in the system.
  • Page 70 Figure 40. Removing the power cords (L003) 56 Power Systems: Power Systems: Memory...
  • Page 71 DANGER: Multiple power cords. The product might be equipped with multiple AC power cords or multiple DC power cables. To remove all hazardous voltages, disconnect all power cords and power cables. (L003) 4. Label and disconnect all external cables that are attached to the PCIe adapters. 5.
  • Page 72 Do not pull out or install any drawer or feature if the rack stabilizer brackets are not attached to the rack. Do not pull out more than one drawer at a time. The rack might become unstable if you pull out more than one drawer at a time.
  • Page 73 Attention: • Attach an electrostatic discharge (ESD) wrist strap to the front ESD jack, to the rear ESD jack, or to an unpainted metal surface of your hardware to prevent the electrostatic discharge from damaging your hardware. • When you use an ESD wrist strap, follow all electrical safety procedures. An ESD wrist strap is used for static control.
  • Page 74 Figure 42. Removing the service access cover 8. To activate the identify LED for the faulty part, press and hold push-button (A) on the trusted platform module card as shown in the following figure. Verify that the green LED (B) is lit, which indicates that sufficient power exists for the identify LED. If the LED (B) is not lit, use the location code to find the physical location by using the service label.
  • Page 75 Figure 43. Activating the identify LED 9. Locate the amber LED for the failed memory riser. Make a note of which memory riser is lit. Figure 44 on page 62 shows the locations (A) of the memory riser LEDs. Memory riser for the 9040-MR9 61...
  • Page 76 Figure 44. LEDs for a memory riser If the locator function does not work, you will need to use the event log information to locate the memory riser to remove. Removing a memory riser from the 9040-MR9 system To remove a memory riser from the system, complete the steps in this procedure. Procedure 1.
  • Page 77 Figure 45. Removing a memory riser 3. Remove the memory modules from the memory riser: a) Record the location of the memory module that you want to remove. b) To unlock the memory module from its connector, simultaneously push both of the locking tabs away from the module.
  • Page 78: Replacing A Memory Riser

    Figure 46. Removing a memory module Replacing a memory riser in the 9040-MR9 system To replace a memory riser in the system, complete the steps in this procedure. Procedure 1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged into a ground jack or connected to an unpainted metal surface.
  • Page 79 Figure 47. Replacing a memory module 3. To insert the memory riser, complete the following steps: a) Ensure the release latches (A) are fully open to a 90 degree angle as shown in the following figure. b) Align the memory riser with the connector. c) Press the memory riser firmly into the connector.
  • Page 80 Figure 48. Inserting a memory riser Preparing the 9040-MR9 system for operation after removing and replacing a memory riser To prepare the system for operation after you remove and replace a memory riser, complete the steps in this procedure. Procedure 1.
  • Page 81 Figure 49. Installing the service access cover 3. Complete the following steps to place the system in the operating position. a. Unlock the blue rail safety latches (A) by pushing them towards the front as shown in the following figure. b.
  • Page 82 Figure 50. Placing the system into the operating position 4. Using your labels, reconnect the power cords (A) to the system unit as shown in the following figure. Fasten the power cords to the system by using the hook-and-loop fasteners (B) as shown in the following figure.
  • Page 83 5. Using your labels, reconnect all of the external cables that plug into the PCIe adapters. 6. Start the system. For instructions, see Starting a system (www.ibm.com/support/knowledgecenter/ POWER9/p9haj/crustartsys.htm). 7. Turn off the identify LED. For instructions, see Deactivating an identify LED (www.ibm.com/support/ knowledgecenter/POWER9/p9haj/p9haj_turn_off_identify_led.htm). 8. Verify the installed part.
  • Page 84 Permanently removing a memory riser from the 9040-MR9 system Find information about permanently removing a memory riser from the IBM Power System E950 (9040- MR9) server. About this task If your system is managed by the Hardware Management Console (HMC), use the HMC to repair a part in the system.
  • Page 85 Use the blue identify LED on the enclosure to locate the system. Ensure that the serial number of the system matches the serial number to be serviced. 2. Stop the system. For instructions, see Stopping a system (www.ibm.com/support/knowledgecenter/ POWER9/p9haj/crustopsys.htm). 3. Label and disconnect the power source from the system by unplugging the power cords from the system.
  • Page 86 72 Power Systems: Power Systems: Memory...
  • Page 87 DANGER: Multiple power cords. The product might be equipped with multiple AC power cords or multiple DC power cables. To remove all hazardous voltages, disconnect all power cords and power cables. (L003) 4. Label and disconnect all external cables that are attached to the PCIe adapters. 5.
  • Page 88 Figure 53. Placing the system in service position 6. Attach the electrostatic discharge (ESD) wrist strap. The ESD wrist strap must be connected to an unpainted metal surface until the service procedure is completed, and if applicable, until the service access cover is replaced. Attention: •...
  • Page 89 a. Push the release latches (A) in the direction shown in the following figure. b. Slide the cover (B) off the system unit as shown in the following figure. When the front of the service access cover has cleared the upper frame ledge, lift the cover up and off the system unit. Figure 54.
  • Page 90 Figure 55. Removing a memory riser 3. If the removed part is used again, place the part on an electrostatic discharge (ESD) mat. 4. For each memory riser that you are removing, insert a memory riser filler into that slot as shown in Figure 56 on page 77.
  • Page 91 Figure 56. Inserting a memory riser filler 5. Repeat steps “2” on page 75 - “4” on page 76 for each memory riser that you want to remove. Preparing the 9040-MR9 system for operation after permanently removing a memory riser To prepare the system for operation after you permanently remove a memory riser, complete the steps in this procedure.
  • Page 92 Figure 57. Installing the service access cover 3. Complete the following steps to place the system in the operating position. a. Unlock the blue rail safety latches (A) by pushing them towards the front as shown in the following figure. b.
  • Page 93 Figure 58. Placing the system into the operating position 4. Using your labels, reconnect the power cords (A) to the system unit as shown in the following figure. Fasten the power cords to the system by using the hook-and-loop fasteners (B) as shown in the following figure.
  • Page 94 5. Using your labels, reconnect all of the external cables that plug into the PCIe adapters. 6. Start the system. For instructions, see Starting a system (www.ibm.com/support/knowledgecenter/ POWER9/p9haj/crustartsys.htm). 7. Turn off the identify LED. For instructions, see Deactivating an identify LED (www.ibm.com/support/ knowledgecenter/POWER9/p9haj/p9haj_turn_off_identify_led.htm). 8. Verify the installed part.
  • Page 95: Notices

    Consult your local IBM representative for information on the products and services currently available in your area. Any reference to an IBM product, program, or service is not intended to state or imply that only that IBM product, program, or service may be used. Any functionally equivalent product, program, or service that does not infringe any IBM intellectual property right may be used instead.
  • Page 96: Accessibility Features For Ibm Power Systems Servers

    This product uses standard navigation keys. Interface information The IBM Power Systems servers user interfaces do not have content that flashes 2 - 55 times per second. The IBM Power Systems servers web user interface relies on cascading style sheets to render content properly and to provide a usable experience.
  • Page 97: Trademarks

    Contact the vendor for accessibility information about its products. Related accessibility information In addition to standard IBM help desk and support websites, IBM has a TTY telephone service for use by deaf or hard of hearing customers to access sales and support services:...
  • Page 98 Um dieses sicherzustellen, sind die Geräte wie in den Handbüchern beschrieben zu installieren und zu betreiben. Des Weiteren dürfen auch nur von der IBM empfohlene Kabel angeschlossen werden. IBM übernimmt keine Verantwortung für die Einhaltung der Schutzanforderungen, wenn das Produkt ohne Zustimmung von IBM verändert bzw.
  • Page 99 Generelle Informationen: Das Gerät erfüllt die Schutzanforderungen nach EN 55024 und EN 55022 / EN 55032 Klasse A. Japan Electronics and Information Technology Industries Association (JEITA) Notice This statement applies to products less than or equal to 20 A per phase. This statement applies to products greater than 20 A, single phase.
  • Page 100 Properly shielded and grounded cables and connectors must be used in order to meet FCC emission limits. Proper cables and connectors are available from IBM-authorized dealers. IBM is not responsible for any radio or television interference caused by using other than recommended cables and connectors or by unauthorized changes or modifications to this equipment.
  • Page 101: Class B Notices

    Um dieses sicherzustellen, sind die Geräte wie in den Handbüchern beschrieben zu installieren und zu betreiben. Des Weiteren dürfen auch nur von der IBM empfohlene Kabel angeschlossen werden. IBM übernimmt keine Verantwortung für die Einhaltung der Schutzanforderungen, wenn das Produkt ohne Zustimmung von IBM verändert bzw.
  • Page 102 Tel: +49 (0) 800 225 5426 email: HalloIBM@de.ibm.com Generelle Informationen: Das Gerät erfüllt die Schutzanforderungen nach EN 55024 und EN 55032 Klasse B Japan Electronics and Information Technology Industries Association (JEITA) Notice This statement applies to products less than or equal to 20 A per phase.
  • Page 103: Terms And Conditions

    Permissions for the use of these publications are granted subject to the following terms and conditions. Applicability: These terms and conditions are in addition to any terms of use for the IBM website. Personal Use: You may reproduce these publications for your personal, noncommercial use provided that all proprietary notices are preserved.
  • Page 104 IBM reserves the right to withdraw the permissions granted herein whenever, in its discretion, the use of the publications is detrimental to its interest or, as determined by IBM, the above instructions are not being properly followed.
  • Page 106 IBM®...

This manual is also suitable for:

9040-mr9

Table of Contents