Secondary procedures
Secondary procedures
The end user and technical documentation for the ME70 contains several procedures that
are also applicable for this Factory Acceptance Test. These procedures are not part of the
Factory Acceptance Test. They are provided for reference purposes only. If you scan a
completed Factory Acceptance Test for archiving or reporting purposes, it is not necessary
to include these procedures.
Topics
Turning on the ME70, page 39
Turning off the ME70, page 41
Checking the data transfer on an external interface line, page 42
Defining the file and folder settings for raw data recording, page 43
Turning on the ME70
In order to use the ME70, you must first turn it on. You must first turn on the display and the
Processor Unit. The remaining ME70 units are turned on from the ME70 program.
Prerequisites
The ME70 is installed as specified in the ME70 Installation manual.
The ME70 has been set up with its hardware units connected as specified in the ME70
Installation manual.
Context
The ME70 program is not automatically started when the Processor Unit is turned on. On
the Processor Unit desktop, double-click the ME70 icon to start the program.
39
307958/H