Rinnai Demand Duo R Series Installation And Operation Manual page 35

Automatic circulating tank water heater
Hide thumbs Also See for Demand Duo R Series:
Table of Contents

Advertisement

Single Unit Circulation
Note:
Installation must conform to applicable codes and all requirements listed in this manual. Balancing valves, equivalent piping , pressure gauges,
and temperature gauges are to be used as necessary to ensure proper flow between units.
All components shall be selected for the pressure and temperature rating of the installation.
Figure 32
Tank T&P
Pipe T&P to Open Drain
Demand Duo™ R-Series Installation and Operation Manual
Hot Water Supply Line
Tankless PRV
Building
Circulation
Pump
6 inch. B-Vent
Building Hot
Water
Return Line
(Optional)
Gas Supply
Cold Water Supply
35

Advertisement

Table of Contents
loading

Table of Contents