Rinnai Demand Duo R Series Installation And Operation Manual page 24

Automatic circulating tank water heater
Hide thumbs Also See for Demand Duo R Series:
Table of Contents

Advertisement

Verify proper clearances around the vents.
Ensure that the Combustion Air Requirements are followed that will provide sufficient combustion air
for the appliance.
Ensure you have used the correct venting products for Category 1 and that you have completely
followed the venting manufacturer's installation instructions and these installation instructions. All
installations must be vented in accordance with National Fuel Gas Code NFPA 54/ANSI Z223.1 -
latest edition and the requirements of state or local codes. In Canada, the furnaces must be vented
in accordance with the National Standard of Canada and CAN/CSA B149.1 - latest editions and
amendments and the codes of the local utility or other authority having jurisdiction.
All horizontal vent runs must be sloped up away from the water heater a minimum of 1/4 in. (6 mm)
per foot.
Verify that the vent termination clearances are followed.
Verify that there is adequate combustion air.
Demand Duo™ R-Series Installation and Operation Manual
24

Advertisement

Table of Contents
loading

Table of Contents