Electrical Box / Swing Motor - Daikin FTK18NMVJU Service Manual

Removal procedure
Hide thumbs Also See for FTK18NMVJU:
Table of Contents

Advertisement

Electrical Box / Swing Motor

5. Electrical Box / Swing Motor
Warning
Step
1. Disconnect the
connecting wire.
1
Remove the screw, and
then the service cover.
2
Remove the screw, and
then the wire fixture.
3
Remove the screw, and
then the conduit holding
the connecting wire.
4
Remove the 4 screws
of the terminal board
and disconnect the
connecting wire.
2. Remove the electrical
box.
1
Remove the 2 screws
and detach the earth/
ground wires.
2
Release the earth/
ground wires from the
front slit at the top of the
electrical box.
6
Be sure to wait for 10 minutes or more after turning off all power supplies before
disassembling work.
Procedure
Service cover
Terminal board
Wire fixture
Earth/ground wire (green/yellow)
Earth/ground wire (green)
The service cover can be
removed without removing
the front grille.
The service cover has no
hook and may fall when the
screw is loosened. Be
careful not to drop the
service cover.
(R21502)
Conduit is only for U.S.
models.
Connecting
wire
Conduit
(R21503)
When reassembling, be sure
Front slit
to insert the earth/ground
wires in the front slit and
green/yellow wire is above
the green wire.
Electrical
box
Green/yellow
(R24272)
When reassembling, make
sure to pass the green earth/
ground wire behind the heat
exchanger tube (the tube
with the thermistor).
Si041553EB
Points
Green
(R24275)
Removal Procedure

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents