Complete The Installation - Bosch OVEN Installation Instructions Manual

Slide-in electric ranges with european convection
Hide thumbs Also See for BOSCH OVEN:
Table of Contents

Advertisement

Available languages

Available languages

Complete the installation

Adjust Levelling Legs
Slide Range into Opening
9. Tighten each clamping screw with the appropriate torque (See table below).
Table 4: Appropriate Torque Levels for Aluminum or Copper Wire
Gauge
Torque (in./lbs.)
6
35
8
25
10. Properly secure flexible conduit at knockout panel on range and at supply
side junction box. The wiring is now complete.
Figure 22:
Note: DO NOT plug in range at this time.
1. Line up range in front of opening.
2. Measure back left corner of opening from floor to top of countertop.
3. Measure back left corner of range to bottom of cooktop trim. Use a wrench to
adjust leveling leg until this height is the same as the corner dimension.
4. Repeat in right back corner.
5. Adjust front leveling legs so that the bottom of the cooktop trim is ½" higher
than the corresponding countertop surface.
1. Plug in power cord.
2. Dampen countertop and foam tape with soapy water.
Torque (Nm)
3.95
2.82
green ground sc rew
Completed Three Wire Flexible Conduit Connection
drawer
adjustable leg
Adjust the Front Leveling Leg
Figure 23:
wrench
English 15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents