Units With Statitrac - Trane Voyager Commercial Installation, Operation And Maintenance Manual

Packaged rooftop air conditioners with reliatel controls and estage 27.5 to 50 tons - 60 hz, 22.9 to 41.7 tons 81-148 kw - 50 hz
Hide thumbs Also See for Voyager Commercial:
Table of Contents

Advertisement

I I n n s s t t a a l l l l a a t t i i o o n n G G e e n n e e r r a a l l R R e e q q u u i i r r e e m m e e n n t t s s
Units with Statitrac™ ™
1. Open the filter access door, and locate the Statitrac
Transducer Assembly illustrated in
There are two tube connectors mounted on the left
of the solenoid and transducers. Connect one end
of the field provided 1/4" (length 50-100 ft.) or 3/8"
(length greater than 100 ft.) O.D. pneumatic tubing
Figure 17. Pressure tubing
Atmospheric Pressure Sensing Kit
Top Port Connection
2' X 3/16" OD
tubing factory
provided pneumatic
tubing field installed)
Tubing connector
(in vertical support)
24
Figure 18, p.
Duct Pressure Transducer
Tubing Schematic
Outside air
pressure sensor
Sensor mounting
bracket
Factory provided
bracket
Sensing tube
to outside air
reference
for the space pressurization control to the fitting
indicated in the illustration.
2. Route the opposite end of the tubing to a suitable
25.
location inside the building. This location should be
the largest open area that will not be affected by
sudden static pressure changes.
Duct static
transducer
Sensing tube to
discharge static pressure
sensing location
Duct Pressure Control
Component Layout
Atmospheric reference
tubing connects
here
RT-SVX34R-EN
Supply air
duct static
transducer

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents