The units described in the present manual represent a high value investment, maximum care should be taken to
ensure correct installation and appropriate working conditions.
Installation and maintenance must be performed by qualified and specifically trained personnel only.
Correct maintenance of the unit is indispensable for its safety and reliability. Manufacturer's service centres are the
only having adequate technical skill for maintenance.
This manual provides information about the features and standard procedures for the complete series.
All the units are delivered from factory as complete sets which include wiring diagrams, inverter manuals,
dimensional drawings with dimensions and weight, nameplate with technical characteristics attached to the unit.
WIRING DIAGRAMS, INVERTER MANUALS, DIMENSIONAL DRAWINGS AND NAMEPLATE MUST BE
CONSIDERED ESSENTIAL DOCUMENTS AND AS A PART OF THIS MANUAL
In case of any discrepancy between this manual and the equipment's document refer to on board documents.
For any doubt ask Daikin or authorized centers

Purpose of this manual

The purpose of this manual is to allow the installer and the qualified operator to carry out required operations in order to
ensure proper installation and maintenance of the machine, without any risk to people, animals and/or objects.
This manual is an important supporting document for qualified and trained personnel but it is not intended to replace
such personnel.
All activities must be carried out in compliance with local laws and regulations.

Receiving the machine

The machine must be inspected for any possible damage immediately upon reaching its final place of installation. All
components described in the delivery note must be carefully inspected and checked; any damage must be reported to
the carrier. Before connecting the machine to earth, check that the model and power supply voltage shown on the
nameplate are correct. Responsibility for any damage after acceptance of the machine cannot be attributed to the
manufacturer.

Checks

To prevent the possibility of incomplete delivery (missing parts) or transportation damage, please perform the following
checks upon receipt of the machine:
a) Before accepting the machine, please verify shipment documensts and chechs the number of shipped items
b) Check every single component in the consignment for missing parts or for any damage.
c) In the event that the machine has been damaged, do not remove the damaged material. A set of photographs are
helpful in ascertaining responsibility.
d) Immediately report the extent of the damage to the transportation company and request that they inspect the
machine.
e) Immediately report the extent of the damage to the manufacturer representative, so that arrangements can be
made for the required repairs. In no case must the damage be repaired before the machine has been inspected
by the representative of the transportation company.
ATTENTION
ATTENTION
D-EIMHP00508-16EN - 5/64

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ewyd 250-580bzssEwyd 250-570bzsl

Table of Contents