Setup; Preparing The Machine - Toro 31211 Operator's Manual

Triple bagger hopper kit groundsmaster 360 and 7200 series traction unit
Table of Contents

Advertisement

Setup

Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
1
2
3
4
5
6
Note: Determine the left and right sides of the machine from the normal operating position.
1

Preparing the Machine

No Parts Required
Procedure
Perform the following procedure to prepare the machine for
attaching the blower and finishing kit.
1. Disengage the PTO, move the motion-control levers
to the N
-L
EUTRAL
OCK
brake.
2. Shut off the engine, remove the key, and wait for all
moving parts to stop before leaving the operating
position.
3. Repair all bent or damaged areas of machine deck and
replace any missing parts.
4. Clean the machine of any debris on the deck or rear
part of the machine to ease installation.
Description
No parts required
Adapter
Screw (1/2 x 3-1/2 inches)
Locknut (1/2 inch)
Hood assembly
Bag
Pin and hairpin-cotter assembly
Upper tube
Lower tube
Hose clamp
No parts required
No parts required
position, and set the parking
Qty.
Prepare the machine.
1
2
Install the bagger adapter.
2
1
3
Install the hood assembly and bags.
2
1
1
Install the discharge tubes.
2
Adjust the parking brake.
Check the tire pressure.
4
Use

Advertisement

Table of Contents
loading

Table of Contents