Installing The Drive Pulley Assembly; Bolt, 1/2 X 1-1/4 In; Washer, 1/2 In; Template - Toro 200 Z Master Series Operator's Manual

Bagger
Table of Contents

Advertisement

2
3
1
Figure 9

1. Template

2. Clamp
5. Remove the template.
6. Drill 4 holes, 3/8 in. diameter, into the 1/8 in. pilot
holes. (Fig. 8).
7. Drill 4 holes, 17/32 in. diameter, into the 3/8 in. pilot
holes. (Fig. 8).
Installing the Drive Pulley
Assembly
1. Install the PTO drive belt onto the drive pulley
assembly (Figures 11 and 20).
Note: Make sure the cut–out in the pulley plate is on the
left–hand side of the machine (Fig. 10). This cut–out allows
room for the PTO spring loaded idler pulley.
2. Install the pulley assembly under the rear frame, and
loosely install 4 bolts (1/2 x 1–1/4 in.), 4 washers
(1/2 in.) and 4 locknuts (1/2 in.) (Fig. 10). Do not
tighten bolts now.
4
2
m–5990
3. Tight against back of
frame
4. Flush to side of frame
1
6
Figure 10
1. Rear frame
2. Drive pulley assembly
3. Bolt, 1/2 x 1–1/4 in.
4. Nut, 1/2 in.
Positioning the Drive Pulley Assembly on
an Air Cooled Machine
1. Push the drive pulley assembly all the way forward and
then rearward a 1/4 in. (6 mm) (Fig. 10).
Note: The bolt head on the drive pulley assembly, should
be approximately centered horizontally, in the frame slot
(Fig. 11). View this from the right–hand side of the
machine.
2. Tighten the 4 bolts (1/2 x 1–1/4 in.), 4 washers (1/2 in.)
and 4 locknuts (1/2 in.) (Fig. 10).
Important
A final adjustment may be needed when
installing the bagger belt.
Positioning the Drive Pulley Assembly on
a Liquid Cooled Machine
1. Push the drive pulley assembly all the way rearward and
then forward a 1/4 in. (6 mm) (Fig. 10).
9
4
2
7
5
3
m–6001

5. Washer, 1/2 in.

6. Cut–out
7. Pulley plate

Advertisement

Table of Contents
loading

This manual is also suitable for:

78491

Table of Contents