Electrical Data; Torque Values - Carrier Neos 100S Operation & Service Manual

Truck refrigeration units
Hide thumbs Also See for Neos 100S:
Table of Contents

Advertisement

e. Compressor Pressure Regulating Valve (CPR) (At end of defrost)
10.3 psig
f. Thermostatic Expansion Valve (TXV)
Superheat setting at commissioning:
14.4°F at box temperature of 32°F (0°C);
7.2°F at box temperature of -4°F (-20°C).
g. Low Pressure switch (LP)
Cutout at: -6.5 psig ± 3psig; Cut-in at: +6.5 psig ± 3 psig
2.6.3

Electrical Data

a. Fan Motors
Evaporator Fan Motor (EFM)
Bearing Lubrication:
Horsepower:
Operating Amps:
Speed:
b. Compressor Clutch (CLHR)
Amp Draw = 3.75A
Resistance = 3.2Ω
c. Hot Gas Solenoid Valve (HGS1) Coil
Amp Draw = 1.33 Amp
Resistance = 9.2Ω
d. Condenser Pressure Control Valve (HGS2) Coil
Amp Draw = 1.65 Amp
Resistance = 7.3Ω
Electrical System Requirements
In order to ensure proper unit and vehicle operation, the vehicle should have an electrical system capable
of producing an additional 90 amps of current above the full load current required for the rest of the vehicle
(including all accessories).
e. Standby Module
Input Voltage = 230 VAC 1 phase 50/60hz
Amp Draw = 10 Amp AC
Output Voltage = 13.7 VDC
Output Current = 90 Amp DC
2.6.4

Torque Values

Assembly
Condenser - frame
Mounting Bolts
Factory Lubricated
0.1 kw
7 to 9 amps
2100 rpm (rated)
Condenser Fan Motor (CFM)
Bearing Lubrication:
Operating Amps:
Speed:
ft-lb
7
44 to 60
2-9
Factory Lubricated
10 amps
3300 rpm (rated)
kg-m
1.0
6 to 8
62-11848

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents