Device Test For Remote I/O Station - Mitsubishi Electric MELSEC Q Series Reference Manual

Q corresponding melsecnet/h network system
Hide thumbs Also See for MELSEC Q Series:
Table of Contents

Advertisement

7
APPLICATION FUNCTIONS

7.3 Device Test for Remote I/O Station

7 - 10
The remote I/O network can use operations of GX Developer connected to the remote
I/O station to test the input/output devices of the sequence program without affecting
the online system.
To conduct a test without affecting the system, register the device to be tested in
"Forced input output registration/cancellation" in "debug" in the online menu. For
details about operating the GX Developer, refer to the operating manual for GX
Developer.
The test is performed on the following items.
(1) Stops the Y output from the remote master station to the remote
I/O station.
Even when the Y output is set to ON on the sequence program, it is not output
from the remote I/O station, allowing output testing of the sequence program to
be tested safely. Moreover, if GX Developer is connected directly to the remote
I/O module, forced output from GX Developer to the remote I/O module can be
performed.
At this time, the X input from the remote I/O station is input to the remote master
station.
Common parameters
Forced output for station
number No.1 Y1020
LY is not output
to station No.1
GX Developer
Forced output Y
QCPU
GX Developer
LY
LX
Remote I/O
station No. 1
MELSEC-Q
Remote master station
LX
LY
Remote I/O
station No. 2
7 - 10

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents