Communication Test - Mitsubishi Electric MELSEC Q Series Reference Manual

Q corresponding melsecnet/h network system
Hide thumbs Also See for MELSEC Q Series:
Table of Contents

Advertisement

4
SETTING AND PROCEDURE BEFORE OPERATION

4.10.4 Communication test

1R1
1R2
Network No. 1
1R4
1R3
4 - 36
This test checks whether communications is normally performed between the host
station and a communication-target station (specified with the network number and
station number).
If the communication-target station is in another network, the relay network number
and station number are displayed and the routing parameter settings can be checked.
GX Developer
2N
1
2N
S
S
Host
1MR
2M
2
Network No. 2
P
2N
6
2N
S
S
When the communication test is performed from GX Developer connected to the 2M
in network number 2 to the 4N
following screen appears. The result shows that communications between two stations
is normal.
Return path from the destination
to the host
3
2N
5
3M
1
S
P
4
3N
3
S
Network No. 3
3N
5
3N
4
S
S
6 in network number 4 in the system above, the
S
Forward path from the host
to the destination
4M
1
4N
P
3N
2
4N
5
Network No. 4
S
S
4N
6
4N
S
Destination
Station numbers of
relay stations.
5 is the station No. of
network No. 2 side.
1 is the station No. of
network No. 3 side.
MELSEC-Q
2
4N
3
S
S
4
S
2
P
4 - 36

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents